40
17.2.
President ZC
1.
If tiling is to be applied right up to the sides of the front unit, the top of the front can be moved forward to allow the
tiling to go behind the top. To move the top, slacken the clamping bolts, slide the top forward, retighten the bolts (See figure
81).
2.
Hang the front unit by the hooks at the top corners (See figure 82).
Figure 82
Figure 81