![Valcourt FP11 FRONTENAC Скачать руководство пользователя страница 43](http://html2.mh-extra.com/html/valcourt/fp11-frontenac/fp11-frontenac_installation-and-operation-manual_3204196043.webp)
43
1.4.4
Chimney Installation Instructions
1. Cut and frame the holes in the ceiling, floor and roof where the chimney will pass (see
Figure 29
). Use a plumb bob to line up the center of the holes. Make sure that the size of
the floor and ceiling holes are in accordance with the chimney manufacturer’s
instructions.
Figure 29
2. From below, install a firestop supplied by the chimney manufacturer in each ceiling/floor
separation through which the chimney will pass. At the attic level, install an attic radiation
shield from above (see
Figure 30
).
3. Follow the chimney’s manufacturer’s instructions and place the first chimney length on
the fireplace. For all chimneys, you must use an anchor plate supplied by the chimney
manufacturer before installing the first chimney length (see
Figure 30
). Continue
installing chimney lengths making sure to lock each length in place according to the
chimney manufacturer’s instructions. In many cases, it is recommended to secure
connections with three (3) ½" (12 mm) metal screws.
4. Every time the chimney passes through a ceiling or a wall, install the appropriate firestop.
When you reach the desired height, install the roof support. (Refer to instructions included
with the support).
5. Then, put the roof flashing in place and seal the joint between the roof and the flashing
with roofing pitch (see
Figure 30
). For sloping roofs, place the flashing under the upper
shingles and on top of the lower shingles. Nail the flashing to the roof, using roofing nails.
6. Place the storm collar over the flashing, and tighten it with the bolt supplied. Finally, seal
the joint between the storm collar and the chimney, using silicone caulking.
7. Install the chimney cap.
8. When a ventilated roof flashing is installed, precautions are to be taken not to caulk or seal
the ventilating openings.
Содержание FP11 FRONTENAC
Страница 12: ...12 Figure 5...
Страница 13: ...13 Figure 6...
Страница 15: ...15 Figure 7 Figure 8...
Страница 16: ...16 Figure 9 Figure 10...
Страница 17: ...17 Figure 11...
Страница 18: ...18 Figure 12...
Страница 19: ...19 Figure 13...
Страница 20: ...20 Figure 14 Chase construction Spacers must be installed...
Страница 22: ...22 Facing with the Narrow Overlap Figure 15...
Страница 23: ...23 Facing with the Masonry Trim Figure 16...
Страница 26: ...26 Figure 19...
Страница 30: ...30 Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7...
Страница 32: ...32 Step 3 Step 4 Step 5 Step 6...
Страница 33: ...33 Step 7...
Страница 41: ...41 Figure 27a Figure 27b...
Страница 44: ...44 EXAMPLE OF TYPICAL CHIMNEY INSTALLATION Figure 30...
Страница 46: ...46 Figure 31...
Страница 47: ...47 Figure 32...
Страница 62: ...62 2 4 2 Exploded view for replacement parts...