![Valcourt FP11 FRONTENAC Скачать руководство пользователя страница 31](http://html2.mh-extra.com/html/valcourt/fp11-frontenac/fp11-frontenac_installation-and-operation-manual_3204196031.webp)
31
1.3.8.2
Moulded Refractory Vermiculite Panels (VA11071H)
1.
Remove the andirons (VA7070) by unscrewing the anchoring bolts (30109). Then
place the left refractory panel (22204). Partially screw the panel retainer (PL64601)
with one of the screw (30026) provided.
Step 1
.
2.
Place the lower back refractory pannel (22206).
Step 2
.
3.
Place the top back refractory pannel (22203) on top of the lower back refractory
pannel.
Step 3
.
4.
Place the right refractory panel (22205). Partially screw the panel retainer (PL64601)
with one of the screw (30026) provided.
Step 4
.
5.
Adjust the four refractory panels installed so that the joints are tight and secure them
with the screws in place. Then place the bottom right refractory brick (22207).
Step 5
.
6.
Place the bottom left refractory brick (22199).
Step 6
.
7.
Place the andirons (VA7070) back and secure with the anchoring bolts (30109).
Step 7
.
Step 1
Step 2
Содержание FP11 FRONTENAC
Страница 12: ...12 Figure 5...
Страница 13: ...13 Figure 6...
Страница 15: ...15 Figure 7 Figure 8...
Страница 16: ...16 Figure 9 Figure 10...
Страница 17: ...17 Figure 11...
Страница 18: ...18 Figure 12...
Страница 19: ...19 Figure 13...
Страница 20: ...20 Figure 14 Chase construction Spacers must be installed...
Страница 22: ...22 Facing with the Narrow Overlap Figure 15...
Страница 23: ...23 Facing with the Masonry Trim Figure 16...
Страница 26: ...26 Figure 19...
Страница 30: ...30 Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7...
Страница 32: ...32 Step 3 Step 4 Step 5 Step 6...
Страница 33: ...33 Step 7...
Страница 41: ...41 Figure 27a Figure 27b...
Страница 44: ...44 EXAMPLE OF TYPICAL CHIMNEY INSTALLATION Figure 30...
Страница 46: ...46 Figure 31...
Страница 47: ...47 Figure 32...
Страница 62: ...62 2 4 2 Exploded view for replacement parts...