0020257297_06 Country specifics
201
This Commissioning Checklist is to be completed in full by the competent person who commissioned the heat pump and associated
equipment as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for
future reference.
Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.
AIR TO WATER HEAT PUMP COMMISSIONING CHECKLIST
Customer name:
Telephone number:
Address:
Heat Pump Make and Model
Heat Pump Serial Number
Commissioned by (PRINT NAME):
&HUWL¿HG2SHUDWLYH5HJ1R>@
Company name:
Telephone number:
Company address:
Commissioning date:
%XLOGLQJ5HJXODWLRQV1RWL¿FDWLRQ1XPEHULIDSSOLFDEOH>@
CONTROLS - SYSTEM AND HEAT PUMP
(tick the appropriate boxes)
Time and temperature control to heating
Room thermostat and programmer/timer
Programmable Roomstat
Load/weather compensation
2SWLPXPVWDUWFRQWURO
Time and temperature control to hot water
Cylinder thermostat and programmer/timer
Combined with Heat pump main controls
+HDWLQJ]RQHYDOYHVLQFOXGLQJXQGHUÀRRUORRSV
Fitted
Not required
Hot water zone valves
Fitted
Not required
Thermostatic radiator valves
Fitted
Not required
+HDW3XPS6DIHW\,QWHUORFN>@
Built In
Provided
2XWGRRU6HQVRU
Fitted
Not required
Automatic bypass to system
Fitted
Not required
Buffer Vessel Fitted
Yes
No
If YES
Volume:
Litres
ALL SYSTEMS
7KHKHDWLQJV\VWHPKDVEHHQ¿OOHGDQGSUHVVXUHWHVWHG
Yes
([SDQVLRQYHVVHOIRUKHDWLQJLVVL]HG¿WWHG FKDUJHGLQDFFRUGDQFHZLWKPDQXIDFWXUHU¶VLQVWUXFWLRQV
Yes
7KHKHDWSXPSLV¿WWHGRQDVROLGVWDEOHVXUIDFHFDSDEOHRIWDNLQJLWVZHLJKW
Yes
7KHV\VWHPKDVEHHQÀXVKHGDQGFOHDQHGLQDFFRUGDQFHZLWK%6DQGKHDWSXPSPDQXIDFWXUHU¶VLQVWUXFWLRQV
Yes
What system cleaner was used?
What inhibitor was used?
Quantity litres
Is the system adequately frost protected?
Yes
OUTDOOR UNIT
Are all external pipeworks insulated?
Yes
Is the fan free from obstacles and operational?
Yes
Has suitable consideration been made for waste water discharge?
Yes
CENTRAL HEATING MODE
Heating Flow Temperature
°C
Heating Return Temperature
°C
DOMESTIC HOT WATER MODE
Measure and Record:
Is the heat pump connected to a hot water cylinder?
Unvented
Vented
Thermal Store
Not Connected
Hot water has been checked at all outlets
Yes
+DYH7KHUPRVWDWLF%OHQGLQJ9DOYHVEHHQ¿WWHG"
Yes
Not required
ADDITIONAL SYSTEM INFORMATON
Additional heat sources connected:
Gas Boiler
2LO%RLOHU
Electric Heater
Solar Thermal
2WKHU
ALL INSTALLATIONS
The heating, hot water and ventilation systems complies with the appropriate Building Regulations
Yes
All electrical work complies with the appropriate Regulations
Yes
The heat pump and associated products have been installed and commissioned in accordance with the manufacturer’s instructions
Yes
The operation of the heat pump and system controls have been demonstrated to the customer
Yes
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Yes
Commissioning Engineer’s Signature
Customer’s Signature
7RFRQ¿UPVDWLVIDFWRU\GHPRQVWUDWLRQDQGUHFHLSWRIPDQXIDFWXUHU¶VOLWHUDWXUH
1RWHV>@,QVWDOOHUVVKRXOGEHPHPEHUVRIDQDSSURSULDWH&RPSHWHQW3HUVRQV6FKHPH>@$OOLQVWDOODWLRQVLQ(QJODQGDQG
:DOHVPXVWEHQRWL¿HGWR/RFDO$UHD%XLOGLQJ&RQWURO/$%&HLWKHUGLUHFWO\RUWKURXJKD&RPSHWHQW3HUVRQV6FKHPH$
%XLOGLQJ5HJXODWLRQV&RPSOLDQFH&HUWL¿FDWHZLOOWKHQEHLVVXHGWRWKHFXVWRPHU>@0D\EHUHTXLUHGIRUV\VWHPVFRYHUHG
E\*5HJXODWLRQV
© Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk
Содержание VWL 105/5 AS S2
Страница 203: ......