Decommissioning the product 10

0020221300_04 uniSTOR HP Installation and maintenance instructions

15

9.2

Draining the product

1.

Close the cold water draw-off valve.

2.

Secure a hose to the drain valve.

3.

Position the hose at a suitable drain.

4.

Open the highest hot water tap in the installation.

5.

Open the drain valve and drain the product completely.

6.

Close the hot water tap and the drain valve.

7.

Remove the hose.

9.3

Checking the safety group's expansion
relief valve and the cylinder's expansion
relief valve

1.

Open all expansion relief valves by turning the plug.

2.

Check whether the water is flowing into the tundish.

3.

Check that the expansion relief valves are in the correct
position and then check the pressure.

4.

Check and, if required, clean the pressure reducer.

9.4

Checking the pre-charge pressure of the
expansion vessel

1.

Drain the product. (

Page 15)

2.

Measure the pre-charge pressure of the expansion ves-
sel at the vessel valve.

Condition

: Pressure <0.3 MPa (0.3 bar)

Top up the expansion vessel in accordance with the
static height of the heating installation, ideally with ni-
trogen, otherwise with air.

3.

If water escapes from the valve of the expansion ves-
sel, you must replace the expansion vessel.

4.

Fill and purge the product. (

Page 14)

10 Decommissioning the product

Switch off the heat generator.

Unplug the domestic hot water cylinder's mains plug.

Close the cold-water stopcock.

Drain the product. (

Page 15)

Remove the hydraulic connections and the temperature
sensor.

Remove the cables for the temperature sensor from the
heat generator, control or multi-functional module.

11 Customer service

To ensure regular servicing, it is strongly recommended
that arrangements are made for a Maintenance Agreement.
Please contact Vaillant Service Solutions for further details:

Telephone: 0330

100

3461

Содержание uniSTOR VIH RW GB BES Series

Страница 1: ...ation and maintenance instructions uniSTOR HP VIH RW GB BES GB IE Publisher manufacturer Vaillant GmbH Berghauser Str 40 D 42859 Remscheid Tel 492191 18 0 Fax 492191 18 2810 info vaillant de www vaill...

Страница 2: ...ct dimensions 7 5 Installation 7 5 1 Installing the product 7 5 2 Hydraulic connection 8 5 3 Electrical installation 11 6 Start up 13 6 1 Setting the immersion heater thermostat 13 6 2 Cold water inle...

Страница 3: ...ntenance instructions for the product and any other system com ponents installing and setting up the product in ac cordance with the product and system ap proval compliance with all inspection and mai...

Страница 4: ...correct tool 1 4 5 Risk of material damage caused by frost Do not install the product in rooms prone to frost 1 4 6 Risk of injury due to the heavy weight of the product Make sure that the product is...

Страница 5: ...ements of the appropriate Building Regu lations The Benchmark Checklist can be used to demon strate compliance with Building Regulations and should be provided to the customer for future reference Ins...

Страница 6: ...ation area Select a sensible installation site and take into consideration the routing of the pipework system Install the cylinder as close as possible to the heat generator in order to minimise heat...

Страница 7: ...mplete Refer ence point Quant ity Designation 1 1 Enclosed documentation 2 1 Tundish with retainer 3 1 3 port motorised valve 4 1 Safety group 5 1 Expansion vessel 6 1 Bag with accessories 7 1 Domesti...

Страница 8: ...nd pres sure expansion relief valve 7 Domestic hot water outlet 8 Safety group 9 Tundish 10 Expansion vessel 11 Dry pocket for the tem perature sensor 12 Cold water inlet 13 Drain valve 5 2 1 Connecti...

Страница 9: ...e 15 mm Length of the pipe between the temperature and pressure relief valve and the expansion relief valve 4 600 mm 6 Connect the cold water supply to the safety group 6 Diameter of the cold water su...

Страница 10: ...p in a soakaway with a siphon Low drain pipework for example up to 100 mm above external surfaces car parks mead ows etc can be used provided that it is protected by a wire fence or something similar...

Страница 11: ...ling through the product The product may be damaged by drilling work Do not drill through the product 70 60 50 40 70 60 50 40 1 3 2 4 1 3 2 4 1 2 3 4 1 Immersion heater 2 Immersion heater ther mostat...

Страница 12: ...he cover for the electrics on the cylinder 2 Install a separate power supply for the immersion heater in accordance with the applicable standards 3 Use heat resistant cables for the immersion heater c...

Страница 13: ...the primary circuit 1 Connect the thermostat for the primary circuit and the thermal cut out Diameter of the cable 1 5 mm Condition S plan 70 60 50 40 70 60 50 40 1 3 2 4 1 3 2 4 L N 2 1 3 2 2 4 4 1 8...

Страница 14: ...r ator 3 Move the lever to AUTO 4 Remove the cover for the electrics 5 Set the product s thermostat and the immersion heater s thermostat Setting the thermostats 60 6 Start up the heat generator 7 Dra...

Страница 15: ...pressure of the expansion vessel 1 Drain the product Page 15 2 Measure the pre charge pressure of the expansion ves sel at the vessel valve Condition Pressure 0 3 MPa 0 3 bar Top up the expansion ves...

Страница 16: ...stat to 55 C 4 Replace the thermostat Irregular domestic hot water output at the valve 1 Defective expansion vessel 2 Thermal control 1 Set the expansion vessel 2 Interrupt the power supply of the pro...

Страница 17: ...90 90 90 Load pressure in the expan sion vessel 0 3 MPa 3 0 bar 0 3 MPa 3 0 bar 0 3 MPa 3 0 bar 0 3 MPa 3 0 bar Maximum temperature of the heating circuit 95 95 95 95 Maximum domestic hot water tempe...

Страница 18: ...230 V 50 Hz Immersion heater power 2 8 kW 2 8 kW 2 8 kW 2 8 kW Low loss header 230 240 V 50Hz 230 240 V 50Hz 230 240 V 50Hz 230 240 V 50Hz Thermostat 230 240 V 50Hz 230 240 V 50Hz 230 240 V 50Hz 230...

Страница 19: ...Appendix 0020221300_04 uniSTOR HP Installation and maintenance instructions 19 D Commissioning Checklist...

Страница 20: ...WUROV KDYH EHHQ WWHG LQ FRPSOLDQFH ZLWK 3DUW RI WKH XLOGLQJ 5HJXODWLRQV Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is...

Страница 21: ...3 Date Engineer name Company name Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Com...

Страница 22: ...ipe 9 Documents 5 Drain valve 8 Draining the product 15 E Electricity 3 F Filling and purging the primary circuit 14 Filling and purging the product 14 Frost 4 H Handing over to the end user 14 I Iden...

Страница 23: ......

Страница 24: ...byshire DE56 1JT Telephone 0330 100 3461 info vaillant co uk www vaillant co uk These instructions or parts thereof are protected by copyright and may be reproduced or distributed only with the manufa...

Отзывы: