Installation instructions geoTHERM VWS/VWW 0020057444_01
42
7.2.2 Calling up the screens
The menus are identified by a number at the top right of
the display. You can access the next menu by turning
the dial. The numbers make it easier to find individual
menus during programming.
7.2.3 Typical operating sequence on the operator
level
• Turn the dial until the re-
quired menu is selected.
• Turn the dial until the pa-
rameter to be changed is se-
lected.
• Press the dial to mark the
parameter to be changed. The
parameter will be highlighted
on a dark background.
• Turn the dial to change the
set value of the parameter.
• Press the dial to accept the
new value.
• Repeat this sequence until all
the settings have been made.
7.3
Carrying out the initial commissioning
As soon as the heat pump is supplied with power during
the initial commissioning, an internal self-test starts au-
tomatically, whereby the heat pump checks itself and
any connected components for functional capability. At
the same, the sensor configuration is checked, the
phase sequence of the AC supply is determined and the
functioning of the sensors in use is checked.
If the self-test was not successful, an error message ap-
pears on the controller display (see Chap. 10, "Trouble-
shooting and diagnosis").
• Switch on the circuit breaker, so that the heat pump is
supplied with power.
The heat pump starts, the controller software is initial-
ised:
Vaillant
Loading...
Fig. 7.2 Controller being initialised
After a short time the controller is ready for operation
and detects that this is an intial commissioning. During
the initial installation the controller always starts with
the Installation Assistant - Menu A1.
Installation
A1
Language selection
Language
>GB english
>Select
Fig. 7.3 Menu A1: Language selection
Change the language setting if necessary and turn the
dial to the next menu.
Installation Assistant
A2
Hydraulic plan
0
Electroplan
0
Accept change
No
>Select
Fig. 7.4 Menu A2: Installation Assistant
h
The heat pump type has already been
set at the factory and may not be
changed!
Selecting the hydraulic plan
a
Caution!
Possible malfunctions.
Take care to select the correct hydraulic
plan, as otherwise malfunctions can
occur in the system.
• Turn the dial until the cursor
>
points to the number
that indicates
Hydraulic plan No.
• Press the dial. The parameter will be activated and
displayed in inverse video.
7 Start-up
Содержание geoTHERM VWS Series
Страница 1: ...For the heating engineer Installation instructions geoTHERM Heat pump VWS VWW GB ...
Страница 90: ......
Страница 91: ......
Страница 92: ...0020057444_01 GB 072008 ...