Contents
Installation instructions geoTHERM VWS/VWW 0020057444_01
2
Contents
Contents
1
Notes on the documentation ........................... 3
1.1
Storage of the documents ...................................... 3
1.2 Symbols
used
............................................................. 3
1.3
Applicability of the manual ..................................... 4
1.4 CE
label
........................................................................ 4
1.5 Intended
use
............................................................... 4
2
Description of the appliance ........................... 5
2.1 Data
badge
.................................................................. 5
2.2 Functional
principle
.................................................. 6
2.3
Design of the heat pump ......................................... 7
2.3.1 Component groups - VWS ....................................... 8
2.3.2 Component groups - VWW...................................... 9
2.4
General notes on operating modes
and functions ............................................................. 9
3
Safety instructions and regulations .............. 10
3.1 Safety
instructions
................................................... 10
3.2
Regulations, rules, guidelines ............................... 11
3.2.1 Preliminary remarks for room
sealed appliances ...................................................... 11
3.2.2 Related
documents
................................................... 11
3.3 Coolant
......................................................................... 11
4 Assembly
and
installation
............................... 12
4.1 Accessories
................................................................. 12
4.2
Requirements of the installation site .................. 12
4.3 Dimensions
and
clearances
.................................... 13
4.4
Assembly/Installation at a glance ........................ 14
4.5
Preparatory work in the installation area .......... 14
4.6
Requirements of the heating circuit .................... 15
4.7 Scope
of
delivery
...................................................... 15
4.8
Unpacking the unit and checking
the delivery ................................................................. 16
4.9
Transporting the heat pump .................................. 16
4.10 Installing the heat pump ......................................... 17
4.11 Removing
the
cladding
............................................ 18
4.12 On-site
installation
.................................................... 19
4.12.1 Assembly of the heating system ........................... 20
4.12.2 Assembly of the brine circuit (VWS only) ........... 20
4.12.3 Assembly of the well system (VWW only) .......... 21
4.13
Fitting the VRC DCF outside
temperature sensor .................................................. 21
4.14 Fitting the VR 90 remote control unit................. 21
4.15
Installing the VR 60 mixer module ....................... 21
5
Filling the heating and heat
source systems ................................................. 21
5.1
Filling the heating circuit ........................................ 21
5.2
Filling the brine circuit (VWS only) ....................... 22
5.3
Well system (VWW only) ......................................... 23
6 Electrical
installation
....................................... 24
6.1
Safety and installation information...................... 24
6.2
Regulations pertaining to electrical
installations ................................................................ 24
6.3 Electrical
control
box
............................................... 25
6.4
Connecting the power supply ................................ 25
6.4.1 Unblocked mains supply (Electroplan 1) .............. 26
6.4.2 Dual circuit feed, heat pump tariff
(Electroplan 2) ........................................................... 27
6.4.3 Dual circuit feed, special tariff
(Electroplan 3) ........................................................... 28
6.4.4 Connecting external components
......................... 29
6.5
Connecting the start-up current limiter
(accessory) ................................................................. 29
6.6
Controller PCB at a glance ..................................... 30
6.7
Wiring the controller PCB ....................................... 31
6.7.1 Connecting the VR 10 standard sensor ............... 31
6.7.2 Direct heating operation (Hydraulic plan 1) ....... 32
6.7.3 Mixer circuit with buffer cylinder
(Hydraulic plan 2) ...................................................... 33
6.7.4 Direct heating operation and domestic
hot water cylinder (Hydraulic plan 3) .................. 34
6.7.5 Mixer circuit with buffer cylinder and
domestic hot water cylinder
(Hydraulic plan 4) ..................................................... 35
6.7.6 Cooling
......................................................................... 36
6.8
Connecting the DCF receiver ................................. 36
6.9 Connecting
accessories
........................................... 36
6.9.1 Installing the VR 90 remote control unit ............ 36
6.9.2 Connecting further mixer circuits ........................ 37
6.9.3 Connecting vrnetDIALOG
........................................ 37
6.10 Connecting an external boiler ............................... 38
6.11
Fitting the cladding and the operating panel .... 38
7 Start-up
.............................................................. 41
7.1
General points regarding start-up ........................ 41
7.2 Operating
the
controller
......................................... 41
7.2.1 Finding your way around the controller ............. 41
7.2.2 Calling up the screens ............................................. 42
7.3
Carrying out the initial commissioning ............... 42
7.4
Bleeding the brine circuit (VWS only) ................ 43
7.5
Bleeding the heating circuit ................................... 43
7.6
Handing the system over to the operator .......... 43
8 Controller
........................................................... 44
8.1
Operating modes and functions ............................ 44
8.2 Automatic
auxiliary
functions
................................ 44
8.3 Settable
auxiliary
functions.................................... 45
8.3.1 Auxiliary functions in the Operator Level: ......... 45
8.3.2 Auxiliary functions in the Code Level: ................. 45
8.3.3 Auxiliary functions via vrDIALOG: ........................ 46
8.4
Description of the controller .................................. 46
8.4.1 Possible
system
circuits
.......................................... 46
8.4.2 Energy balance control
........................................... 46
8.4.3 Buffer cylinder charging principle ........................ 47
8.4.4 Resetting to factory settings ................................. 47
8.4.5 Controller organisation ........................................... 47
8.5
Operator level sequence diagram ........................ 48
8.6
Code level sequence diagram ................................ 49
8.7
Displays in the operator level ................................ 51
8.8
Displays in the code layer ....................................... 56
8.9 Installer
Menu
............................................................ 64
Содержание geoTHERM VWS Series
Страница 1: ...For the heating engineer Installation instructions geoTHERM Heat pump VWS VWW GB ...
Страница 90: ......
Страница 91: ......
Страница 92: ...0020057444_01 GB 072008 ...