Appendix
16
Installation and maintenance instructions eloSTOR pro 0020196671_06
VEH 50/7-3
VEH 80/7-3
VEH 100/7-3
VEH 120/7-3
Heat-up time (from 10 to 60 °C) at 1 kW
2.73 h
4.60 h
6.83 h
–
Heat-up time (from 10 to 60 °C) at 1.5 kW
–
–
–
4.35 h
Heat-up time (from 10 to 60 °C) at 2 kW
1.43 h
2.18 h
3.51 h
–
Heat-up time (from 10 to 60 °C) at 3 kW
–
–
–
2.16 h
Heat-up time (from 10 to 60 °C) at 4 kW
0.73 h
1.00 h
1.82 h
–
Heat-up time (from 10 to 60 °C) at 4.5 kW
–
–
–
1.32 h
Heat-up time (from 10 to 60 °C) at 6 kW
0.39 h
0.68 h
0.90 h
0.98 h
Permissible operating pressure
0 … 0.6 MPa
0 … 0.6 MPa
0 … 0.6 MPa
0 … 0.6 MPa
Technical data
–
Electrics
VEH 50/7-3
VEH 80/7-3
VEH 100/7-3
VEH 120/7-3
Electric connection
–
230 V/50 Hz
–
400 V/50 Hz
–
230 V/50 Hz
–
400 V/50 Hz
–
230 V/50 Hz
–
400 V/50 Hz
–
230 V/50 Hz
–
400 V/50 Hz
Rated current
16 A
16 A
16 A
16 A
Level of protection
IP25D
IP25D
IP25D
IP25D