background image

6 Start-up

8

Installation and maintenance instructions eloSTOR pro 0020196671_06

Connect the product to a permanent mains connection
via a partition wall.

Requirements for the partition: Contact opening of at
least 3 mm; mains connection is switched off at all
pins

Make sure that the line protection switches are suitable
for the measuring current.

Measuring current: 16 A

5.3

Electrical installation

12

45

L1L2

L3N

1

3

4

5

7

6

2

1

Mains connection cable

2

Auxiliary connection
cable

3

Cable duct

4

Strain relief

5

Mains connection ter-
minal

6

Output selection ter-
minal

7

Auxiliary connection
terminal

Danger!
Risk of electric shock

There is a risk of electric shock when working
on electrical components that are connected
to the low-voltage network.

Disconnect the product from the power
supply.

Secure the product against being
switched back on again.

Check that the product is de-energised.

Only open the product when it is de-ener-
gised.

Caution.
Material damage due to the mains connec-
tion cable and auxiliary connection cable
being switched

If the connection cables are switched, the
product can be operated but the thermostat
and safety cut-out will not work.

Ensure that the mains connection cable is
correctly connected to the mains connec-
tion terminal and the auxiliary connection
cable to the auxiliary connection terminal.

1.

Observe the connection diagram. (

Page 12)

2.

Guide the mains connection cable

(1)

through the cable

duct

(3)

and through the strain relief

(4)

.

3.

Tighten the screws on the strain relief

(4)

.

4.

Secure the mains connection cable

(1)

to the mains

connection terminal

(5)

.

5.

Guide the auxiliary connection cable

(2)

through the

cable duct

(3)

and through the strain relief

(4)

.

6.

Tighten the screws on the strain relief

(4)

.

7.

Secure the auxiliary connection cable

(2)

to the auxiliary

connection terminal

(7)

.

Re-work

Using an indelible pen, note the connected power on the
identification plate.

6

Start-up

1.

Open the cold water stop cock.

2.

Open the hot water valves.

3.

Wait until water flows out of the hot water valves.

4.

Close the hot water valves.

5.

Check that the expansion relief valve is functioning
properly by venting the expansion relief valve.

Water must escape from the expansion relief valve.

6.

Ensure that the safety cut-out is switched on.

The red button must be pushed in.

7.

Check that all of the pipe connections are leak-tight.

8.

Switch on the fuses.

9.

Switch on the line protection switches.

10. Check whether the signal lamp lights up and signals the

heating of the domestic hot water cylinder.

6.1

Operating

The domestic hot water cylinder operating instructions list
the functions that can be set by the operator.

6.2

Checking that the product works correctly

1.

Open the hot water draw-off point that is furthest away
from the domestic hot water cylinder.

If water leaks from the hot water draw-off point, the
domestic hot water cylinder has been sufficiently
filled with water.

2.

When the domestic hot water cylinder is heated for the
first time, check whether the expansion relief valve is
operating correctly.

If water drips from the discharge line, the expansion
relief valve is operating correctly.

Содержание eloSTOR pro VEH 50/7-3

Страница 1: ...nce instructions eloSTOR pro VEH 50 7 3 VEH 80 7 3 VEH 100 7 3 VEH 120 7 3 AT DE Publisher manufacturer Vaillant GmbH Berghauser Str 40 D 42859 Remscheid Tel 49 21 91 18 0 Fax 49 21 91 18 2810 info va...

Страница 2: ...Installing the product 6 5 Installation 7 5 1 Hydraulic installation 7 5 2 Requirements for electrical installation at the installation site 7 5 3 Electrical installation 8 6 Start up 8 6 1 Operating...

Страница 3: ...s not classed as intended use Units that are not classed as vehicles are those that are installed in a fixed and permanent location known as fixed installation Any other use that is not specified in t...

Страница 4: ...er injuries Install the necessary safety group compon ents Do not install hydraulic accessories between the safety group and the do mestic hot water cylinder s cold water pipe Explain to the operator...

Страница 5: ...data MPa bar Max operating pressure IP25D IP rating VDE mark 3 2 CE label The CE label shows that the products comply with the basic requirements of the applicable directives as stated on the identif...

Страница 6: ...ation or replace ment for VEH 6 3 Bearing surfaces for wall support 4 Hot water connection 5 Discharge connection 6 Cold water connection A1 Distance between the product bracket and water connections...

Страница 7: ...et Install the drain pipework at a constant incline Maintain a clearance between the expansion relief valve s discharge pipe and the tundish so that the drain pipework is open to the atmosphere Cleara...

Страница 8: ...train relief 4 3 Tighten the screws on the strain relief 4 4 Secure the mains connection cable 1 to the mains connection terminal 5 5 Guide the auxiliary connection cable 2 through the cable duct 3 an...

Страница 9: ...ect the product from the power supply Page 10 2 Empty the product Page 10 Removing the flange 3 Unscrew the cover on the flange 4 Remove the electrical connections on the heating ele ments 2 from the...

Страница 10: ...Remove the mains connection lines Emptying the product 2 Close the cold water stop cock 3 Open a hot water valve connected to the product 4 Drain the domestic hot water cylinder using the drain cock...

Страница 11: ...l the domestic hot water cylinder Heat up time too long Check that the electrical plug connections and other connections are seated correctly and correct these if necessary Expansion relief valve is o...

Страница 12: ...K2 HK3 TR STB 1 2 3 4 10 6 11 12 13 5 7 8 9 1 Feeding in the single twin circuit switching 2 Mains connection terminal 3 Relay 4 Signal lamp 5 Thermostat 6 Safety overheat cut off device 7 Vessel eart...

Страница 13: ...1 VEH 50 7 3 VEH 80 7 3 VEH 100 7 3 4 kW VEH 120 7 3 4 5 kW 1 2 L1 L3 L2 N 4 5 N PE L3 L2 L1 VEH 50 7 3 VEH 80 7 3 VEH 100 7 3 6 kW VEH 120 7 3 6 kW Operating mode Mains connection Basic load Rapid he...

Страница 14: ...0 7 3 VEH 80 7 3 VEH 100 7 3 2 kW VEH 50 7 3 VEH 80 7 3 VEH 100 7 3 4 kW VEH 120 7 3 3 kW VEH 120 7 3 4 5 kW 1 2 L1 L3 L2 N 4 5 L1 N PE L2 L3 VEH 50 7 3 VEH 80 7 3 VEH 100 7 3 1 kW VEH 50 7 3 VEH 80 7...

Страница 15: ...n Thermal insulation PU foam CFC free Inner vessel Steel enamelled with magnesium protection anode Safety Complies with national safety regulations radio shielded does not affect the mains supply Tech...

Страница 16: ...t 3 kW 2 16 h Heat up time from 10 to 60 C at 4 kW 0 73 h 1 00 h 1 82 h Heat up time from 10 to 60 C at 4 5 kW 1 32 h Heat up time from 10 to 60 C at 6 kW 0 39 h 0 68 h 0 90 h 0 98 h Permissible opera...

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ...betreiber info vaillant at termin vaillant at www vaillant at www vaillant at werkskundendienst Vaillant Deutschland GmbH Co KG Berghauser Str 40 D 42859 Remscheid Telefon 021 91 18 0 Telefax 021 91 1...

Отзывы: