Adapting the boiler to the heating installation
Installation and maintenance instructions ecoTEC 0020173113_01
49
11
>
Regulate the pressure using the setting screw (
1
).
Position of the
setting screw
Pressure
in MPa
(mbar)
Notes/application
Right-hand stop
(turned all the way
down)
35.0 (350)
If the radiators do not get
properly hot in the default
setting.
Note: In this case, you must
set the pump to the maximum
stage.
Mid-position (5 turns
to the left)
25.0 (250) Factory setting
5 further turns to the
left from the mid-posi-
tion
17.0 (170)
If noises in the radiators or
radiator valves are produced
11.4 Setting value for the by-pass valve (feed head)
11.2
Handing over the boiler to the operator
a
Danger!
Risk of poisoning and burns caused by
escaping hot flue gas!
Hot flue gas can escape and cause poison-
ing and burns if the boiler is operated with
an incompletely mounted or open air/flue
gas duct or if the boiler is operated with
internal leaks with the front casing open.
>
Operate the boiler
- for commissioning
- for testing purposes
- in continuous operation
only when the front casing is fitted and
closed and the air/flue gas duct is com-
pletely fitted.
>
Exclusively for test purposes such as gas
working pressure testing the boiler may
be operated with the front casing
removed for short durations ONLY but
must have a completely mounted air/flue
gas duct.
>
After completing the installation, stick the 835593
sticker in the user's language to the front of the boiler.
The sticker is delivered with the boiler.
You must brief the operator of the boiler on the handling
and function of the ecoTEC.
>
Explain the importance of regular maintenance by a
competent skilled trade company to the operator.
It is strongly recommended that a maintenance contract
be taken out to ensure regular maintenance. Important
information is available from Vaillant Service Solutions
(0870 6060 777).
>
Complete the benchmark Benchmark gas boiler commis-
sioning checklist which is found at the end of these
instructions.
If this boiler is not installed and commissioned in accord-
ance with the manufacturer's instructions, this may void
the guarantee (Note: Your legal rights remain unaffected
by this.)
>
Handover the boiler to the operator.
>
Explain the basic operation of the heating installation to
the operator.
>
Provide the operator with all relevant instructions and
boiler documentation.
>
Go through the operating instructions with the operator
>
Reply to his questions if necessary.
>
Make the operator aware of the need to keep the instruc-
tions in a handy location near the boiler, but not in or on
the boiler.
>
Draw special attention to the safety instructions, which
the operator must follow.
>
Instruct the operator that no changes or adaptations
must be made to the flue system or combustion air sup-
ply. These must both terminate outside of the building
and be constructed only from approved components.
>
Explain to the operator how he should monitor the water
level/filling pressure of the system.
>
Explain to the operator which measures are required to
top up and purge the heating installation if required.
>
Explain to the operator how to correctly set the tempera-
tures, the controllers and the thermostatic radiator
valves (economically).
>
Complete and sign off the Benchmark commissioning
check list.
>
Complete and sign off the guarantee documentation.