Inspection and maintenance
Instructions for installation and servicing ecoTEC 839592_13
59
7
>
Check gas flow rate as previously detailed.
>
Check for water leaks.
>
Refit case, ensuring that a good seal is obtained.
7.6 Test
operation
Always perform the following checks after completing
any maintenance task:
>
Commission the appliance according to the relevant
operating manual.
>
Check the appliance for gas and water leaks.
>
Check the air/flue gas installation for leaks, check its
fastening.
>
Check for ignition and an even flame on the burner.
>
Check that the heating system and the water heating
is working (combination boilers only).
>
Fill out the Benchmark gas boiler commissioning
checklist at the rear of this guide.
Fig. 7.12 Function check
Содержание ecoTEC plus
Страница 75: ...Installation Commissioning and Service Record...
Страница 78: ......
Страница 79: ......
Страница 80: ...839592_13 GBIE 012012 Subject to change Manufacturer Supplier...