ecoTEC plus 937 installation and maintenance manual

Commissioning, Part I

5.1 

Preparatory checks of the electrical system

•  Check the electrical installation for short circuits, 

proper earthing and earth resistance and for correct 
polarity.

5.2 Gas 

supply

The entire gas installation including the gas meter must 
be inspected, checked for leaks and purged in 
accordance with BS 6891. In the Irish Republic (IE) in 
accordance with the current version of IS 813. 
•  Purge the gas supply by opening the gas isolation 

valve under the unit. 

d

 Danger!

Danger of explosions!
Provide adequate ventilation whilst doing the 
work.
Extinguish all open flames and do not smoke 
during purging. 

•  After purging re-tighten the gas isolation valve and 

check for leaks. (The combi boiler itself does not need 
to be purged.) This takes place through the automatic 
burner ignition monitoring system.)

5.3 

Cold water supply

•  Open all the domestic hot water taps supplied by the 

appliance. 

•  Open the mains water isolating valve supplying the 

appliance.

•  Open the cold water isolating valve under the 

appliance. The water then flows through the combi 
boiler and the shift load storage tank to the hot water 
taps. 

•  Close all the hot water taps one after the other 

starting with the lowest one until the hot water 
pipework is vented. 

•  Check all hot and cold water pipes for leaks.

5.4 

Filling the heating system

h

 Note!

Use the following test programmes for filling 
and venting the heating system:

Filling the heating system

•  Use the test programme P6 for filling the heating 

system:

The diverter valve moves to the central position, the 
heating pump is not running and the unit does not go 
into heating mode. 
•  Use the test programme as described in Section 8.2.

Vent the heating system

•  Use the test programme P.0 to vent the combi boiler, 

the heating system and the hot water circuit:

The unit does not go to heating mode, the heating pump 
runs intermittently and alternately vents the heating 
circuit and the hot water circuit. • Use the test 
programme as described in Section 8.2.

5.4.1 

Checking the filling pressure of the heating 
system

bar

bar

1

2

Fig. 5.1   Checking the filling pressure of the heating system

h

 Note!

The ecoTEC plus 937 is supplied fitted with a 
pressure gauge and a digital pressure display.
Using the pressure gauge you can perform a 
quick check whether the filling pressure is 
within the prescribed range or not, even when 
the unit is switched off.
With the unit switched on, you can read off the 
exact pressure by pushing the button "-" (2).

For proper operation of the heating system, when the 
installation is cold, the pointer on the pressure gauge (

1

should be in the dark-grey area. This corresponds to a 
filling pressure between 1.0 and 2.0 bar. If the pointer is 
in the light grey area, top up with water.

If the heating system extends over several storeys, the 
system may require a higher filling pressure.

Commissioning, Part I 5

Содержание ecoTEC plus 937

Страница 1: ...For the heating engineer Instructions for installation and servicing ecoTEC plus 937 Wall hung room sealed fan assisted condensing boiler with 15 litre shift load power store VUI GB...

Страница 2: ...21 4 7 Fitting the appliance hanging bracket 21 4 8 Mounting the combination boiler 22 4 9 Removing the front case 22 4 10 General instructions concerning the heating system 22 4 11 Gas connection 23...

Страница 3: ...essure of the expansion vessel of the combination boiler 49 7 6 Checking filling pressure of the expansion vessel of the shift load storage tank 49 7 7 Re commissioning the combination boiler 50 7 8 T...

Страница 4: ...manual This installation manual applies exclusively to the unit with the following part number 0010003809 The part number of the unit can be obtained from the identification plate 1 3 General notes T...

Страница 5: ...rective Directive 73 23 EEC of the Commission with revisions Directive Concerning Electrical Operating Equipment for Use Within Specific Voltage Limits Low voltage directive Directive 89 336 EEC of th...

Страница 6: ...tal excess pressure central heating 3 0 bar Volume of water circulating T 20 K 1204 l h Approximating condensation water volume at 50 C Feed 30 C Return 2 9 l hr Pump head 250 mbar Minimum water flow...

Страница 7: ...s ecoTEC plus 937 Key 1 Heating return pipe 22 mm 2 Cold water connection 15 mm 3 Gas connection 22 mm 4 Hot water connection 15 mm 5 Heating flow pipe 22 mm 6 Hanging bracket 7 Flue hole flue system...

Страница 8: ...7 8 Fig 2 2 Dimensions shift load storage tank Key 1 Heating return pipe 22 mm 2 Cold water connection 15 mm 3 Gas connection 22 mm 4 Hot water connection 15 mm 5 Heating flow pipe 22 mm 6 Hanging br...

Страница 9: ...lements combi unit Key 1 Expansion vessel combi boiler 2 Air intake pipe 3 Compact thermal module 4 Ignition electrode 5 Fan 6 Diverter valve with built in automatic adjustable bypass 7 pump 8 Electro...

Страница 10: ...Operating display 7 Secondary heat exchanger 8 Automatic air vent 9 Pump 10 Pressure relief valve 11 Diverter valve 12 Gas valve 13 Fan 14 Compact thermal module 15 Shift load storage tank electronics...

Страница 11: ...the Local Authority Building Regulations The Building Regulations Scotland The Building Regulations Northern Ireland and the relevant recommendations of the following British Standards BS 6700 Servic...

Страница 12: ...ng unit Check that all parts have been delivered undamaged see Fig 3 1 and Table 3 1 hNote At this stage do not yet remove the combi boiler and the shift load storage tank from the expanded polystyren...

Страница 13: ...storage tank and combi boiler in rooms where there is a danger of frost Caution In rooms with aggressive damp or dust the combi boiler must be operated independent of the ambient air Make sure that wh...

Страница 14: ...880 650 70 Fig 3 5 Item No 303 200 80 125 3 7 Flue termination The following information applies to both flue pipe systems a The terminal position must be located in such a position that any flammable...

Страница 15: ...adjacent surfaces the terminal should be extended as shown in Fig 3 7 2 Dimension F These dimensions can be reduced to 25 mm without having a negative effect on the output of the combi boiler However...

Страница 16: ...e heating system The system can be filled using the incorporated filling device This connection must be removed again after the filling process is complete If the local Water Authority regulations do...

Страница 17: ...Fig 3 8 Technical data of the pump in the combi boiler 3 11 2 Shift load storage tank circulation pump The shift load storage tank is equipped with a maintenance free charging pump 3 12 System Bypass...

Страница 18: ...d Take care to avoid trip hazards slippery or wet surfaces and when climbing steps and stairs Always use assistance if required Carriage of carton from point of delivery to point of installation first...

Страница 19: ...e if required Recommend wear suitable cut resistant gloves with good grip to protect against sharp edges and ensure good grip when handling appliance Positioning of Appliance for Final Installation wi...

Страница 20: ...the combi boiler should be selected so that there is adequate room around the boiler for service and maintenance work the flue pipe of the combi boiler can operate properly i e the location of the te...

Страница 21: ...the flue gas system Install the flue gas system observe the separate installation instructions for the flue pipe 4 7 Fitting the appliance hanging bracket 1 3 2 Fig 4 3 Shift load storage tank with ha...

Страница 22: ...ws to remove the front cladding Release the screw 1 on the base of the unit Push the two retaining clips 2 on the base of the unit inwards until the front case releases Hold the front case by the bott...

Страница 23: ...Remove the gas connection pipe elbow 2 and gas isolation valve 1 from the packaging Push the union nut 3 and the olive 4 onto the gas pipe which protrudes from the combi boiler Push the isolation valv...

Страница 24: ...top Tighten the union nuts in this position Insert the fibre washer 7 and screw the copper tail 6 which is included with the storage tank module to the hot water connection on the unit The diameter of...

Страница 25: ...ped 22 mm pipes 5 and 6 Push the pipes 5 and 6 into the isolation valves up to the stop Tighten the union nuts in this position Fit the handle for the filling loop to the cold water isolation valve 9...

Страница 26: ...he internal discharge branch e g sink waste or washing machine with an external termination the condensate discharge pipe should have a minimum diameter of 22 mm with no length restriction and should...

Страница 27: ...ged if water or steam is discharged Please note that the end of the discharge pipe must be visible hNote We recommend that the discharge pipe for the pressure relief valve is not shortened 4 17 Storag...

Страница 28: ...upplies only the appliance and controls The connection must permit complete isolation of the appliance and its connected controller from the mains supply It should be easily accessible and be located...

Страница 29: ...o the printed circuit board Push the flat connector X31 onto the plug socket X31 2 left hand side of the printed circuit board Fix the cable 4 in the electronics box via the cable clamps 4 19 3 Connec...

Страница 30: ...ecting Heating pump 2 speed pump plug with 5 pins Mains connection 230 V 50 Hz Fuse 2 A slow acting Igniter Attention Do not connect mains voltage Danger of destroying the electronics Diagnosis via eB...

Страница 31: ...7 black X 20 8 blue X 2 12 green X 2 11 red X 2 9 black Pump X 20 18 red 24 VDC X 20 9 blue Erde X 20 16 blue Earth X 20 13 black X 20 12 black X 20 4 grey PWM X 20 3 black Hall Signal X 20 17 red 24...

Страница 32: ...p X 1 7 Green X 1 1 Black X 1 8 red Storage tank sensor NTC X 1 4 orange X 1 1 Black Plug connection Aqua Sensor Shift load storage tank electronics X 1 2 brown X 1 1 Black X 1 2 Brown X 1 1 Black X 1...

Страница 33: ...cipator of a room thermostat 4 20 3 Details for the connection of an external timer to the terminal strip 3 9 8 7 POWER SUPPLY 230 V 50 Hz L L L N N N N 20 VDC DO NOT USE 7 8 9 IN UK FUSE 3 A SWITCH C...

Страница 34: ...s the combi boiler from switching on again within a preset time period after the last switch off of the central heating Hot water preparation is not affected by this function Hot water can be drawn of...

Страница 35: ...the heating system h Note Use the following test programmes for filling and venting the heating system Filling the heating system Use the test programme P6 for filling the heating system The diverter...

Страница 36: ...the heating system h Note If the water pressure in the heating system is too low the display switches between error message F 22 and the display of the actual pressure when the unit is switched on Fil...

Страница 37: ...illing the condensate siphon 1 Fig 5 4 Filling the condensate siphon d Danger If the condensate siphon is empty during operation of the combi boiler there is a danger that exhaust gases can flow into...

Страница 38: ...ntinue with the settings or start up the unit if the supply pressure is not within the range 17 25 mbar a Liquid gas DO NOT continue with the settings or start up the unit if the supply pressure is le...

Страница 39: ...Press the i button The symbol is displayed Then the part load setting is shown in kW Use the buttons and to increase or decrease the displayed value in steps of 1 kW The displayed value flashes durin...

Страница 40: ...showing a consistent flame picture Carry out a function check of the heating system see Section 6 1 2 and the hot water preparation see Section 6 1 3 Hand over the appliance to the user see Section 6...

Страница 41: ...n the hot water storage tank the storage tank is heated up to 70 C once every 24 hours In such a case there is a danger of scalding when drawing the water off The Legionella protection control can be...

Страница 42: ...ature only on combination boilers the pressure gauge Make the operator acquainted with the operation of any external controllers Explain to the operator the importance of regular maintenance by a comp...

Страница 43: ...est and always carry out a function check after completion of maintenance work or after replacing gas carrying components After all maintenance work and after replacing electrical components check the...

Страница 44: ...n 2 x 6 Remove compact thermo module as described in Section 7 2 1 if maintenance is required as a result of steps 2 3 or 5 Clean the primary heat exchanger Fit seal kit for burner door observe the fi...

Страница 45: ...t Switch the combi boiler off Isolate the power supply from the combi boiler Remove the bottom cover if fitted of the combi boiler by releasing both the spring clips and lowering the back of the botto...

Страница 46: ...densation heat exchanger a Caution Protect the electronics box from water splashes 3 4 1 2 Fig 7 3 Cleaning the integral condensation heat exchanger Dismantle the compact thermo module as described un...

Страница 47: ...mpact module must be replaced every time the module is removed e g during maintenance see Table 7 1 If the burner flange insulation on the thermo compact module shows any signs of damage or is showing...

Страница 48: ...ion in a counterclockwise direction Clean the siphon part by flushing it out with water Fill the lower section with water until about 10 mm below the upper edge Re fit the lower section to the condens...

Страница 49: ...r and the heating system 7 6 Checking filling pressure of the expansion vessel of the shift load storage tank 1 2 Fig 7 12 Checking filling pressure of the expansion vessel of the shift load storage t...

Страница 50: ...seal is good 7 8 Test mode Always perform the following steps after performing any maintenance work Commission the appliance in accordance with the instructions in the relevant operating manual Check...

Страница 51: ...N Set the temperature of the central heating to Maximum Set the temperature of the hot water preparation to Maximum Check that all external controllers are switched on and are demanding heat if no ext...

Страница 52: ...function due to water shortage temperature gradient S 96 Return flow sensor test heat demands hot water or heating are blocked S 97 Water pressure sensor test heat demands hot water or heating are bl...

Страница 53: ...circulation pump via accessory module 1 to 100 on 0 off d 22 Hot water demand 1 on 0 off d 23 Summer winter function 1 Winter 0 Summer d 25 Hot water activation via eBUS controller 1 yes 0 no d 30 Co...

Страница 54: ...valve 6 External error message d 28 Switching relay 2 on the accessories module 1 Circulation pump 2 Ext pump factory setting 3 External cylinder charging pump 4 Flue gas flap extractor hood 5 Externa...

Страница 55: ...ecognition shift load storage tank Setting range 0 not recognised 1 no communication via PE BUS Module recognised earlier 2 Communication OK Setting 0 Unregister shift load storage tank from combi boi...

Страница 56: ...shortage temperature rise too quick Pump seized low output from the pump air in appliance system pressure too low F 25 Compact thermal module wiring harness open circuit Wiring harness thermo compact...

Страница 57: ...n the electronics box Table 8 4 Error codes continuation 8 2 Test programmes Special functions can be triggered in the appliance by activating various test programs These programmes are listed in deta...

Страница 58: ...ck the system for gas leaks after completion of the work Carry out a function test see Section 7 8 After all maintenance work and after replacing electrical components check the earthing polarity and...

Страница 59: ...ts ensure that the safety instructions from Section 9 1 are observed Disconnect the appliance from the mains as described in Chapter 9 1 and close the gas isolation valve in the gas supply pipe Close...

Страница 60: ...er Pull the plug connection 2 of the thermal fuse off the primary heat exchanger Unscrew the three screws 3 on the holder of the primary heat exchanger Turn the holder to the side around the rivet 1 p...

Страница 61: ...the shift load storage tank After completion of the work check the system for gas leaks and carry out a function test see Section 7 8 9 7 Replacing the storage tank pump of the shift load storage tank...

Страница 62: ...ection 9 1 Close the gas isolation valve in the gas supply pipe Close the isolation valves in the hot water system and drain the water out of the combi boiler and the shift load storage tank Remove th...

Страница 63: ...matically takes the pre set parameters from the components which have not been changed Replacing the display or the electronics When replacing both components after being turned on the appliance goes...

Страница 64: ...t requirements in this regard The selection process for choosing the raw materials takes into account their recycling properties the dismantlability and the separation facility of the component groups...

Страница 65: ...65 ecoTEC plus 937 installation and maintenance manual EC declaration of conformity Appendix EC declaration of conformity...

Страница 66: ......

Страница 67: ......

Страница 68: ...0020031552_00_GB 022007...

Отзывы: