Contents
3
ecoTEC plus 937 installation and maintenance manual
6 Functional
checks
(commissioning, Part II) .............................. 40
6.1 Functional
checks
................................................. 40
6.1.1
Method of procedure ........................................... 40
6.1.2 Heating
................................................................... 40
6.1.3 Hot water operation ............................................ 40
6.1.4 Storage tank charging .......................................... 41
6.1.5 Subsequent flushing through of the
heating system ("hot") ......................................... 41
6.2
Handing over the device to the owner ........... 42
6.3 Vaillant
warranty
.................................................. 42
6.3.1 Two years warranty ............................................. 42
6.3.2 Registering with us .............................................. 42
6.3.3 First
aid
................................................................... 42
7 Inspection
and
maintenance
...................... 43
7.1 First
inspection
..................................................... 43
7.1.1 Safety
instructions
............................................... 43
7.1.2 Maintenance
.......................................................... 44
7.1.3
Overview of inspection and maintenance
tasks ........................................................................ 44
7.1.4
Function check of the combination boiler ..... 45
7.2 Maintenance
of
the
thermo-compact
module .................................................................... 45
7.2.1
Removal of the thermo-compact module ...... 45
7.2.2 Cleaning the integral condensation
heat-exchanger ..................................................... 46
7.2.3 Checking the burner ............................................ 47
7.2.4 Fitting the thermo-compact module ............... 47
7.3
Cleaning the condensate siphon ...................... 48
7.4
Cleaning strainer in cold water supply ........... 48
7.5
Checking filling pressure of the expansion
vessel of the combination boiler ...................... 49
7.6
Checking filling pressure of the expansion
vessel of the shift load storage tank ............... 49
7.7
Re-commissioning the combination boiler .... 50
7.8 Test
mode
............................................................... 50
8
Troubleshooting ..............................................51
8.1 Logical
fault
finding
procedure
.......................... 51
8.1.1 Status
codes
........................................................... 51
8.1.2 Diagnostic
codes
.................................................. 52
8.1.3 Error codes ............................................................ 55
8.1.4 Fault
memory
........................................................ 55
8.2
Test programmes .................................................. 57
8.3
Resetting the parameters to factory
settings ................................................................... 57
9 Replacing
components
................................ 58
9.1 Safety
instructions
............................................... 58
9.2
Replacing the burner ........................................... 58
9.3
Replacing the fan or gas valve ......................... 58
9.4
Replacing the expansion vessel ........................ 59
9.5
Replacing the primary heat exchanger .......... 60
9.6
Replacing the expansion vessel of the
shift load storage tank ......................................... 61
9.7
Replacing the storage tank pump of the
shift load storage tank ......................................... 61
9.8
Replacing the aqua sensor ................................ 62
9.9
Replacing the electronics on the shift load
storage tank ........................................................... 62
9.10
Replacing the electronics and the display
on the combination boiler .................................. 63
9.11
Checking and setting the CO
2
content, if
required (air ratio adjustment) ......................... 63
10 Recycling
and
disposal
................................ 64
10.1 Unit
.......................................................................... 64
10.2 Packaging
............................................................... 64
11
Vaillant service ............................................. 64
Appendix
EC
declaration
of
conformity
............................ 65
Gas boiler commisioning checklist ................... 66