Notes on the documentation 2
0020230756_00 0020230738 Installation instructions
11
2
Notes on the documentation
2.1
Observing other applicable documents
▶
You must observe all the operating and installation in-
structions included with the system components.
2.2
Storing documents
▶
Pass these instructions and all other applicable docu-
ments on to the system operator.
2.3
Validity of the instructions
These instructions apply only to:
Product article number
PV electrical immersion
heater including Energy
Manager
0020230738
3
Product description
The product consists of a screw-in heating element (PV elec-
trical immersion heater) and an Energy Manager (installed
in the control cabinet/fuse box), which regulates the heating
output depending on the electrical energy that is available
(e.g. from a photovoltaic installation).
3.1
Design of the PV electrical immersion
heater
1
2
4
3
6
7
9
10
8
5
11
1
Insulating element for
the upper half-ring
2
Inspection opening seal
3
Immersion heaters
4
Reducing flange, pre-
installed with seal to the
screw head
5
PG screwed connection
for the electrical con-
nection
6
Insulating element for
the lower half-ring
7
Insulating sleeve for the
immersion heater head
8
Signal LED
9
PG screwed connection
for the RS485 data
cable
10
Setting control
11
Data plate
3.2
Design of the Energy Manager
6
1
2
4
7
8
9
10
3
5
1
Outputs: Phases L1, L2,
L3
2
RS485 connection
3
Identification plate
4
LAN connection
5
Neutral conductor N
input
6
Inputs: Phases L1, L2,
L3
7
Reset button
8
RS485 signal LED
communication
9
LAN signal LED
10
Operating status of
the signal LED for the
Energy Manager
The software that is installed on the Energy Manager can
measure and visualise the use of electricity from the network
(energy supply company) and the feed-in into the network
(e.g. via the photovoltaic installation). The visualisation is
available in a web interface and in apps for iOS and Android
(see the specific operation instructions for the Energy Man-
ager's user interface).
3.3
CE label
The CE label shows that the products comply with the basic
requirements of the applicable directives as stated on the
identification plate.
The declaration of conformity can be viewed at the manufac-
turer's site.
4
Set-up
4.1
Checking the scope of delivery
▶
Check that the scope of delivery is complete and intact.
Number
Designation
1
PV electrical immersion heater
1
Reducing flange
1
Inspection opening seal
1
Energy Manager
1
Plug-in RS485 spring terminal block
1
Operating and installation instructions