background image

 

 

 

INSTALLATION, OPERATION and 

MAINTENANCE  

Figure 930 Air & Vacuum Valves 

 

INTRODUCTION 

This  manual  will  provide  the  information  to 
properly  install,  operate  and  maintain  the  valve 
to ensure a long service life.  The Figure 930 Air 
&  Vacuum  Valve  is  ruggedly  constructed  to 
provide  years  of  trouble-free  operation  with 
minimal maintenance.  
 
These Air & Vacuum Valves are not intended for 
use with fluids containing suspended solids such 
as  wastewater  and  sewage.   The  GA  Industries 
Figure  935  or  939  Sewage  Service  Air  & 
Vacuum  Valves  are  recommended  for  such 
applications. 

 

CAUTION 

The  valve  is  NOT  recommended  for  use  with 
toxic  fluids,  fuels  or  fluids  containing  hazardous 
gases 
 
 
The  Shop  Order  (SO)  Number,  Figure  Number, 
size  and  pressure  rating  are  stamped  on  a 
nameplate attached to the valve.  Please refer to 
the SO number when ordering parts.  
 

DESCRIPTION OF OPERATION

 

The  Figure  930  allows  air  that  is  being  pushed 
ahead  of  the  incoming  fluid  to  escape  and 
ensure  a  complete  filling  of  the  pipeline  or 
vessel.    Once  the  air  has  been  exhausted  and 
the system is pressurized the valve closes tight.  
It  does  not  re-open  unless  and  until  the  system 
is  drained  and/or  a  negative  pressure  condition 
occurs within the pipe or vessel in order to admit 
air to minimize the vacuum condition. 
 
The  Figure  930  employs  the  Kinetic  aero-
dynamic  operating  principle  designed  to  ensure 
the  valve  is  not  prematurely  blown  shut  by  the 
high velocity exiting air. 
  

RECEIVING AND STORAGE 

Inspect  the  valve  upon  receipt  for  damage 
during  shipment.    Carefully  unload  all  valves  to 
the ground without dropping.  Do not pick up the 
valve by the “cowl.”  
 

 
The  valves  should  remain  in  a  clean,  dry  and 
weather  protected  area  until  installed.    For  long 
term storage (greater than 6 months) the rubber 
surfaces  of  the  seat  should  be  coated  with  a 
non-toxic  lubricant  such  as  "SuperLube"  made 
by  Synco  Chemical.    Do  not  expose  the  rubber 
parts to sunlight or ozone. 
 

INSTALLATION 

Sizes 

½” to 3” Figure 930 are standard with NPT 

inlet and outlet connections.  T

he 4” is standard 

(optional  1

”  to  3”)  with  ANSI  Class  125  or  250 

flanged  inlet  and  NPT  outlet.    The  inlet  and 
outlet  connections  are  the  same  size.  Consult 
the drawings of record to verify the configuration 
supplied and installed. 
 
The valve must be installed in an upright vertical 
orientation,  normally  at  a  high  point  in  the 
system. 
 
If  installed  outdoors,  below  ground  in  a  vault  or 
in an unheated area, adequate freeze protection 
must  be  provided.    Some  discharge  of  water 
may occur just prior to valve closure.  If installed 
indoors  or  in  a  vault,  the  valve  outlet  should  be 
directed to an adequate drain.  
 
An  isolating  valve  should  be  installed  between 
the valve and the pipeline or system to facilitate 
maintenance.    
 
Carefully  screw  threaded  end  valves  onto  pipe 
nipple using compatible thread sealant.  Tighten 
valve  using  wrench  flats.    DO  NOT  OVER-
TIGHTEN. 
 
Flat-faced  flanged  valves  should  be  mated  with 
flat-faced  flanges  and  full-face  gaskets.    If  ring 
gaskets  are  used  the  bolt  material  shall  be 
ASTM  A307  Grade  B  (or  equivalent).    Higher 
strength  bolting  should  only  be  used  with  full-
face gaskets.   

 

Lower  heavy  valves  using  slings  or  chains 
around  the  valve  body  and/or  the  lifting  eye.  
Lubricate  the  bolts  or  studs  and  insert  around 
flange.    Lightly  tighten  bolts  until  gaps  are 

Содержание GA INDUSTRIES 983-D

Страница 1: ...Combination Air Valves with Surge Check Instructions SECTION 2 Figure 930 Air Vacuum Valve Instructions SECTION 3 Figure 905 Air Release Valve Instructions SECTION 4 Figure F284 D Surge Check Instructions 234 Clay Avenue Mars PA 16046 USA Telephone 724 776 1020 Fax 724 776 1254 E mail info ga vag group com Manual Number IOM 983 01 3 4inch 082622 ...

Страница 2: ...Section 1 ...

Страница 3: ...Description of Operation 1 Receiving Storage 1 Installation 1 Start Up 2 Preventative Maintenance 2 Testing 2 Trouble Shooting 2 Repair Instructions 2 Replacement Parts 2 Warranty 2 Assembly Drawing Component Location 2 234 Clay Avenue Mars PA 16046 USA Telephone 724 776 1020 Fax 724 776 1254 E mail info ga vag group com Manual Number IOM 983 01 3 4 082622 ...

Страница 4: ...d all valves to the ground without dropping Valves should remain in a clean dry and weather protected area until installed After completion of shop testing the valve is drained of the test water but a small residual amount could remain so the valve should be protected from freezing during storage INSTALLATION Figure Number 983 D has an ANSI Class 125 flanged pipeline connection The standard valve ...

Страница 5: ...slowly open the isolating valve 6 The Figure 930 float should rise and seal tightly while the Figure 905 may continue to release air for a while then close tightly TROUBLESHOOTING SYMPTOM or PROBLEM SOLUTION Leakage from outlet of Air Vacuum valve when closed Debris lodged between float and seat Remove debris inspect for damage Worn or damaged seat ring Inspect replace See Figure 930 Repair Instru...

Страница 6: ...Section 2 ...

Страница 7: ...ANUAL Figures 930 T 930 DT 930 UT to 4 Air Vacuum Valves for Clean Water Drawings EAV 7051 EAV 7052 EAV 7053 234 Clay Avenue Mars PA 16046 USA Telephone 724 776 1020 Fax 724 776 1254 E mail info ga vag group com Manual Number 931 1 IOM 082622 ...

Страница 8: ...all valves to the ground without dropping Do not pick up the valve by the cowl The valves should remain in a clean dry and weather protected area until installed For long term storage greater than 6 months the rubber surfaces of the seat should be coated with a non toxic lubricant such as SuperLube made by Synco Chemical Do not expose the rubber parts to sunlight or ozone INSTALLATION Sizes to 3 F...

Страница 9: ...nd to verify there is no fluid leakage TESTING Valve operation can be easily tested Close the inlet isolation valve and remove or loosen the pipe plug nearest the inlet to drain the water from the valve The float should drop as the water leaves the valve NOTE A ball or gate valve can be installed in place of the pipe plug to facilitate testing Replace or tighten the pipe plug and slowly open the i...

Страница 10: ...lated 5 Float Ball 316 Stainless Steel 6 Pipe Plug Malleable Iron 7 Cover Nuts Steel Zinc Plated 8 Float Guide 3 UHMW Polyethylene 4 Stainless Steel 9 Cushion Buna N Rubber 10 Bearing Acetal Polymer 11 Pipe Nipple Brass 12 Flange Cast Iron Figure 1 Standard NPT Inlet Parts 11 12 Only on Optional Flanged Inlet REPLACEMENT PARTS Genuine replacement parts are available from your local VAG GA Industri...

Страница 11: ...Section 3 ...

Страница 12: ...TION OPERATION AND MAINTENANCE MANUAL Figure 905 1 Air Release Valves Drawing EAV 7010 234 Clay Avenue Mars PA 16046 USA Telephone 724 776 1020 Fax 724 776 1254 E mail info ga vag group com 905 IOM 022620 Rev B ...

Страница 13: ...r level rises lifting the float and re closing the valve This sequence occurs as often as necessary to release air that has collected in the valve RECEIVING AND STORAGE Inspect the valve upon receipt for damage during shipment Carefully unload all valves to the ground without dropping The valves should remain in a clean dry and weather protected area until installed For long term storage greater t...

Страница 14: ...e is not preventing the float from freely falling when fluid is drained from valve Verify linkage mechanism operates freely without binding or sticking Verify pressure at valve inlet does not exceed maximum working pressure DISASSEMBLY Although the Figure 905 air release valve may be more easily serviced by removing it from the line all valves can be serviced while the body remains connected to th...

Страница 15: ...ax 724 776 1254 E mail quotes ga vag group com Please have the nameplate data available when ordering parts REPAIR KITS Soft Goods Kit A905 Part Number 2 80 11000 002 includes items 3 and 7 Linkage Kit AL905 Part Number 2 80 11000 078 includes items 5 6 8 and 14 WARRANTY The Warranty for GA Industries valves is included in our Terms and Conditions which can be found here https gaindustries com ter...

Страница 16: ...Section 4 ...

Страница 17: ...TALLATION OPERATION AND MAINTENANCE MANUAL Figure F284 D Anti Slam Surge Check Valves 234 Clay Avenue Mars PA 16046 USA Telephone 724 776 1020 Fax 724 776 1254 E mail info ga vag group com IOM F284D 070822 ...

Страница 18: ...ould remain in a clean dry and weather protected area until installed For long term storage greater than 6 months the rubber surfaces of the seat should be coated with a non toxic lubricant such as SuperLube made by Synco Chemical Do not expose the rubber parts to sunlight or ozone VALVE CONSTRUCTION GA Industries Figure F284 D Anti slam Surge Check Valves have a globe style valve body with integr...

Страница 19: ...ocks or 2 x 4 s under the flange outboard of the bronze seat so that it can drop out of the body Ensure the surface beneath the valve will not damage the internal components when they drop out of the valve Place a metal rod on top of the stem inside the bushing Hit the top of the rod with a hammer or mallet and the internal components should drop out of the valve body Inspect the seating surfaces ...

Страница 20: ...meplate data available when ordering parts WARRANTY The Warranty for GA Industries valves is included in our Terms and Conditions which can be found here https gaindustries com terms Anti Slam Surge Check Valve Item Description Standard Material 1 Body Ductile Iron 2 Seat Lead Free Bronze 3 Poppet Lead Free Bronze 4 Seat O Ring EPDM Rubber 5 Seal EPDM Rubber 6 Bushing Bronze Table 1 Butterfly Valv...

Отзывы: