12
Installation
- FITTING THE COVER
8
check list
SECTION
Fig.15
Fig.16
Fig.17
FITTING THE COVER
Fitting The Cover - valve & knob positions
• Turn the valve spindle
clockwise
until it
stops
(fig.15).
• Turn the temperature control on the cover
fully
clockwise
until it stops
(fig.16)
.
• Clip the neon into the back of the Start/Stop
assembly on the inside of the cover. The wires
should be routed and the neon installed as
shown in
(fig.17).
• Offer the cover to the unit.
• Carefully locate the cover making sure wires
are not trapped.
• Guide the cover into position so that the
control spindle locates correctly (minor
adjustment may be necessary to align the
control and spindle).
• Should any difficulty arise, recheck the points
above.
• While applying slight pressure to the front
cover, secure in position with the retaining
screws.
• Fit the flexible hose to the shower outlet
making sure the outlet of the hose is directed
to waste. Check the supplied sealing washer
is in place.
•
DO NOT attach the showerhead at this
stage.
•
Fit the Riser Rail and Kit
(see kit
instructions).
Valve
spindle
Fully
clockwise
WARNING
COVER RETAINING SCREWS
ONLY
the
SUPPLIED SCREWS
should be
used. The use of none supplied screws
WILL
invalidate product specifications & warranty.
Содержание BLACK CHIC
Страница 25: ...21 ...