43
20901115_12+16C_VARIO_sel_V1.0_130618
Commissioning (operation)
5.3 Shutdown (switch off)
Take the pump out of operation
1.
Stop the process and let the diaphragm pump run on for
about 30 minutes, with open gas ballast or open inlet.
5
Condensate and media residues will be flushed out of the
vacuum pump.
IMPORTANT!
>
Prevent deposits and rinse condensate out of
the pump.
2
(a)
2.
Switch rocker switch
(a)
off – switch position
O
.
5
Pump switched off.
3.
Disconnect the pump from the apparatus.
4.
Check the pump for dirt and damage.
Switch pump off
Содержание MV 10C VARIO select
Страница 26: ...26 20901115_EN_Mx10 12 16C_VARIO_sel_V1 0_130618 Product description...
Страница 38: ...38 20901115_EN_Mx10 12 16C_VARIO_sel_V1 0_130618 Installation and connection...
Страница 86: ...86 20901115_EN_Mx10 12 16C_VARIO_sel_V1 0_130618...
Страница 87: ...87 20901115_EN_Mx10 12 16C_VARIO_sel_V1 0_130618...