GPRS CONNECTION(OPTIONAL)
Inverter provides a GPRS(radio frequency) interface which control the switch time of a
designated load via an exteral Smart Plug (purchase the product from supplier if needed.)
so that the load mostly consumes PV energy and incurs the lowest-possible energy costs
during operation.
INVERTER MANIPULATION
Start inverter after checking all below steps:
1. Ensure the inverter fixed well on the wall.
2. Make sure all the DC wirings and AC wirings are completed.
3. Make sure the meter is connected well.
4. Make sure the battery is connected well.
5. Make sure the external EPS contactor is connected well. (if needed)
6. Turn on the AC switch and EPS switch
7. Turn on the PV/DC switch and battery switch.
GPRS CONNECTION STEPS
Please refer to the Smart Plug user manual for detailed connection steps.
Please connect to the port below
Grid
METER
AC
EMITTER
Could
com
Содержание VT-6608303
Страница 32: ...8 1 2 PV2 input display interface 8 1 3 Bus voltage 8 1 5 BMS parameters 8 1 6 BMS parameters 8 1 4 Battery...
Страница 33: ...8 1 7 Grid connected output 8 1 8 Inverter output 8 1 9 Load 8 1 10 Power...
Страница 34: ...8 1 11 Power 8 1 12 Temperature 8 1 13 Status information 8 1 14 Error information...
Страница 36: ...8 2 Setting 8 2 1 System setting...
Страница 37: ......
Страница 38: ......
Страница 39: ...8 2 2 BAT Setting...
Страница 40: ......
Страница 41: ...8 2 3 Grid standard...
Страница 42: ...8 2 4 System setting...
Страница 43: ......
Страница 44: ......
Страница 45: ...8 2 5 485 Address 8 2 6 485 Baud rate 8 2 7 Language...
Страница 46: ...8 2 8 LCD backlight 8 2 9 Date time 8 2 10 Clear history...
Страница 47: ...8 2 11 Password Setting 8 2 12 Maintenance 8 2 13 Factory reset 8 2 14 Inquiry...
Страница 48: ......
Страница 49: ...8 2 12 Statistics...
Страница 50: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......