7 Power On
1 Power on the charger/inverter at the user terminal.
2 Set the battery MCB/Switch to ON (if available).
3 Observe Run/Alarm indicator and judge the battery operating status. If the
RUN indicator of the battery is on and the ALARM indicator is off, indicating that the
battery is working normally.
4 Please configure the actual number of batteries in parallel connection through
the UIWare. As follows.
7.1.2 Power On
This section is for professionals only and requires specific tools and software.
Currently only open to growcol accredited engineers.
NOTE