3N0/3NK/3PD/3PG
1-4-43
8800
Document finisher main
program error
Document finisher main pro-
gram error at power up.
DF main PWB
1. Confirm that the wiring connector is
firmly connected and, if necessary,
connect the connector all the way in.
DF main PWB (YC4) and Engine PWB
(YC18)
2. If the wiring is disconnected, shorted or
grounded, replace the wiring.
3. Replace the DF main PWB. (see page
Engine PWB
1. Check the engine software and upgrade
to the latest, if necessary.
2. Replace the engine PWB
8900
Document finisher backup
error
Read and write data does not
match 3 times in succession.
DF main PWB
1. Confirm that the wiring connector is
firmly connected and, if necessary,
connect the connector all the way in.
DF main PWB (YC4) and Engine PWB
(YC18)
2. If the wiring is disconnected, shorted or
grounded, replace the wiring.
3. Replace the DF main PWB. (see page
8990
DF Setup error
When a bridge unit is unde-
tectable in the state where DF
is connected.
When a bridge unit is detected
in the state where DF is not
connected.
Bridge unit
Document finisher
1. Confirm that the wiring connector is
firmly connected and, if necessary,
connect the connector all the way in.
DF main PWB (YC4) and Engine PWB
(YC18) (3000-sheet finisher)
DF main PWB (YC7) and Engine PWB
(YC18) (1000-sheet finisher)
2. If the wiring is disconnected, shorted or
grounded, replace the wiring.
DF main PWB
Replace the DF main PWB(Refer to the
service manual for the document finisher).
Engine PWB
Replace the engine PWB. (see page 1-5-33)
Code
Contents
Causes
Check procedures/
corrective measures
Содержание AK 740
Страница 1: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Страница 2: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Страница 4: ...Revision history Revision Date Pages Revised contents ...
Страница 5: ...This page is intentionally left blank ...
Страница 11: ...This page is intentionally left blank ...
Страница 17: ...3N0 3NK 3PD 3PG 1 1 4 2 Mail box option Figure 1 1 2 1 2 1 Trays 1 7 2 Mailbox cover ...
Страница 27: ...3N0 3NK 3PD 3PG 1 2 8 Bridge unit Procedure 1 Remove two tapes from the bridge unit Figure 1 2 10 Tape Tape ...
Страница 29: ...3N0 3NK 3PD 3PG 1 2 10 This page is intentionally left blank ...
Страница 45: ...3N0 3NK 3PD 3PG 1 3 16 This page is intentionally left blank ...
Страница 129: ...3N0 3NK 3PD 3PG 2 2 9 This page is intentionally left blank ...
Страница 155: ...1 1 INSTALLATION GUIDE DF 791 3000 sheet finisher Installation Guide ...
Страница 170: ...AK 740 Bridge unit Installation Guide ...
Страница 172: ...MT 730 B Mail box Installation Guide ...
Страница 187: ...PH 7A C D Punch unit Installation Guide ...