![Utax AK 740 Скачать руководство пользователя страница 54](http://html.mh-extra.com/html/utax/ak-740/ak-740_service-manual_1064861054.webp)
3N0/3NK/3PD/3PG
1-4-9
Conveying
guide,
approaching
guide, feed-
shift guide
1. Check that the foreign
objects including scrips,
paper clips, etc., do not exist
in the paper conveying paths.
If foreign objects such as scrips, etc., remain in the
paper conveying path, remove.
2. Check that the paper
conveying guide and the
separation needles are not
contaminated with toner,
paper dusts, etc.
If dirty, clean the guide, ribs (by a cloth), and the
separation needles (by a cleaning brush).If the ribs of
the conveying guides were broken or deposited with
toner, replace.
3. Check that the paper
conveying guide has no
barrs, deformations, or
abrasions; and it is properly
mounted without being
floated.
Clean the conveying guide or the paper approaching
guide.Remove any protrusions including barrs.If floated,
fix it properly.If deformation or abrasion is observed,
replace.
4. Check that the guide.
Check that the guide is
smoothly operative when
manipulated.
If the guide is inoperative or won't operate smoothly,
replace the guide or the unit.
5. Check that the guide.
Perform U033 to check the
operation of the solenoid to
sight-check or audio-check its
action.
If the guide is inoperative or won't operate smoothly, re-
assemble the guide or replace the solenoid or the unit.
Check items
Check description
Corrective measures
Содержание AK 740
Страница 1: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Страница 2: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Страница 4: ...Revision history Revision Date Pages Revised contents ...
Страница 5: ...This page is intentionally left blank ...
Страница 11: ...This page is intentionally left blank ...
Страница 17: ...3N0 3NK 3PD 3PG 1 1 4 2 Mail box option Figure 1 1 2 1 2 1 Trays 1 7 2 Mailbox cover ...
Страница 27: ...3N0 3NK 3PD 3PG 1 2 8 Bridge unit Procedure 1 Remove two tapes from the bridge unit Figure 1 2 10 Tape Tape ...
Страница 29: ...3N0 3NK 3PD 3PG 1 2 10 This page is intentionally left blank ...
Страница 45: ...3N0 3NK 3PD 3PG 1 3 16 This page is intentionally left blank ...
Страница 129: ...3N0 3NK 3PD 3PG 2 2 9 This page is intentionally left blank ...
Страница 155: ...1 1 INSTALLATION GUIDE DF 791 3000 sheet finisher Installation Guide ...
Страница 170: ...AK 740 Bridge unit Installation Guide ...
Страница 172: ...MT 730 B Mail box Installation Guide ...
Страница 187: ...PH 7A C D Punch unit Installation Guide ...