3N0/3NK/3PD/3PG
1-3-4
U019
Completion
Press the stop key. The screen for selecting a maintenance item No. is display.
Item No.
Description
Display
Description
DP
Document processor firmware
DP Boot
Document processor booting
PF1
Paper feeder firmware
PF1 Boot
Paper feeder booting
DF
Document finisher firmware
DF Boot
Document finisher booting
PH
Punch unit firmware
PH Boot
Punch unit booting
MT
Mailbox firmware
MT BOOT
Mailbox booting
Fax APL1
FAX APL1
Fax Boot1
FAX boot1
Fax IPL1
FAX IPL1
Fax APL2
FAX APL2 (multi port)
Fax Boot2
FAX boot (multi port)
Fax IPL2
FAX IPL2 (multi port)
Mode1
Installed application name
Mode2
Installed application name
Mode3
Installed application name
Mode4
Installed application name
Mode5
Installed application name
Содержание AK 740
Страница 1: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Страница 2: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Страница 4: ...Revision history Revision Date Pages Revised contents ...
Страница 5: ...This page is intentionally left blank ...
Страница 11: ...This page is intentionally left blank ...
Страница 17: ...3N0 3NK 3PD 3PG 1 1 4 2 Mail box option Figure 1 1 2 1 2 1 Trays 1 7 2 Mailbox cover ...
Страница 27: ...3N0 3NK 3PD 3PG 1 2 8 Bridge unit Procedure 1 Remove two tapes from the bridge unit Figure 1 2 10 Tape Tape ...
Страница 29: ...3N0 3NK 3PD 3PG 1 2 10 This page is intentionally left blank ...
Страница 45: ...3N0 3NK 3PD 3PG 1 3 16 This page is intentionally left blank ...
Страница 129: ...3N0 3NK 3PD 3PG 2 2 9 This page is intentionally left blank ...
Страница 155: ...1 1 INSTALLATION GUIDE DF 791 3000 sheet finisher Installation Guide ...
Страница 170: ...AK 740 Bridge unit Installation Guide ...
Страница 172: ...MT 730 B Mail box Installation Guide ...
Страница 187: ...PH 7A C D Punch unit Installation Guide ...