3N0/3NK/3PD/3PG
2-1-10
Figure 2-1-13 Eject tray section block diagram
YC19-1,2,3,4
DFTM
BRAKE,DIR,CLK,ENABLE
MTRY HP1 SENS SIG
TRY HALF SENS SIG
DFTS1
DFTS3
YC23-15
MTRY FULL SENS SIG
DFTS4
YC22-3
TRY U SENS SIG K
DFTUSS1,2
YC21-19
YC13-3
EJECT CL
YC14-9
TRY HP2 SENS SIG
DFTS2
YC20-18
YC23-9
DFECL
YC14-11,12,13,14
YC14-1,2,3,4
5,6,7,8
DFSFM
1,2
DFSFRM
SFT SET SENS 2B,1B,1A,1B
SFT F MOT 2B,1B,2A,1A
SFT R MOT 2B,1B,2A,1A
SFT SET SENS SIG
DFSFSS
YC22-30
Содержание AK 740
Страница 1: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Страница 2: ...Service Manual RFXPHQW LQLVKHU D 07 3 LUVW GLWLRQ Date 2 0 20 3 SM06 ...
Страница 4: ...Revision history Revision Date Pages Revised contents ...
Страница 5: ...This page is intentionally left blank ...
Страница 11: ...This page is intentionally left blank ...
Страница 17: ...3N0 3NK 3PD 3PG 1 1 4 2 Mail box option Figure 1 1 2 1 2 1 Trays 1 7 2 Mailbox cover ...
Страница 27: ...3N0 3NK 3PD 3PG 1 2 8 Bridge unit Procedure 1 Remove two tapes from the bridge unit Figure 1 2 10 Tape Tape ...
Страница 29: ...3N0 3NK 3PD 3PG 1 2 10 This page is intentionally left blank ...
Страница 45: ...3N0 3NK 3PD 3PG 1 3 16 This page is intentionally left blank ...
Страница 129: ...3N0 3NK 3PD 3PG 2 2 9 This page is intentionally left blank ...
Страница 155: ...1 1 INSTALLATION GUIDE DF 791 3000 sheet finisher Installation Guide ...
Страница 170: ...AK 740 Bridge unit Installation Guide ...
Страница 172: ...MT 730 B Mail box Installation Guide ...
Страница 187: ...PH 7A C D Punch unit Installation Guide ...