5
4. SCOPE OF SUPPLY
Table 4.1 provides a list of products supplied with boilers UT-100; UT-150; UT-200; UT-250; UT-320.
No.
Name of product supplied
Quantity per boiler, pcs.
UT-100
UT-150
UT-200
UT-250
UT-320
1.
Boiler
1
1
1
1
1
2.
Safety valve DN25; PN 4 bar
1
1
1
1
-
3.
Safety valve DN32; PN 4 bar
-
-
-
-
1
4.
Ball valve DN25
2
2
2
2
2
5.
Contact pressure gauge 0 ÷ 6 bar; Ø - 160 mm
1
1
1
1
1
6.
Three-way valve for pressure gauge Dn 15
1
1
1
1
1
7.
Thermal pressure gauge 0 - 120
o
C
1
1
1
1
1
8.
Fan CMP 512 - 2M
1
1
-
-
-
9.
Fan CMP 514 - 2M
-
-
1
1
-
10.
Fan CMP 616 - 2M
-
-
-
-
1
11.
Control console, temperature sensors (comp.)
1
1
1
1
1
12.
Fire-grates..........x...........
13.
Cleaning toolkit
1
1
1
1
1
14.
Tech. documentation set
1
1
1
1
1
Boiler No. is supplied with UT - a set of water heating boiler according to the list of the Table 4.1.
L.S. ______________________________________________________
(manufacturer’s responsible person – signature, full name, position)
th
201