9
6. INSTALLATION
6.1. General Instructions
6.1.1. A boiler (boilers) must be installed in accordance with design, developed by an engineering
company.
6.1.2. Designers of boiler-house and boilers UT-100, UT-150, UT-200, UT-250, UT-320, as well as
installers thereof must be acquainted with these user instructions.
6.2. Premises
6.2.1. Boilers may be installed:
-
in separate rooms;
-
in premises that are immediately adjacent to residential, public, and industrial buildings,
separated from them by firewalls;
-
inside production facilities if the total boiler water capacity does not exceed 2,000 l,
provided that the boilers are isolated from other parts of the premises by fire-resistant
partitions at full height of the boiler, but not lower than 2 m in height;
-
on lower floors and basements of residential, public (except for premises specified in cl.
6.2.2), and industrial buildings where the total boiler capacity does not exceed 1,000 l.
6.2.2. Boilers are prohibited from installing:
-
immediately under the room where a lot of people may gather: under theatre lobbies or
audience halls, sauna’s dressing rooms and washing facilities, shops, medical offices,
classrooms and lecture halls of schools and educational institutions, children institution
rooms, nurseries and group rooms, and under other similar facilities;
-
in premises located under a flammable materials warehouse, except for a fuel storage of the
boiler-house;
-
in areas adjacent to a flammable materials warehouse, except for a fuel storage of the
boiler-house;
-
inside production facilities, where the manufacturing process emits flammable gases,
vapours, or dust.