at the outlet of the drain line is advisable to keep the drain line full and assure correct flow during regeneration. 
Elbows or other fittings must be kept at a bare minimum. 
 

NOTE :

 

Where the drain line is elevated above the control valve or exceeds 20 foot in length, 3 / 4” I.D. drain line tubing 
should be used. A hose clamp (optional, not included) can be used to secure drain line tubing to drain barb. 

 

– Brine Line and Overflow Connection – 

 
1.  Position brine tank on a smooth level surface near the softener resin tank. If necessary, the brine tank can be placed 

at a higher level than the resin tank, but 

never at a lower level.

 

2. 

Install one end of 3 / 8” O.D. by 1 / 4” I.D. brine line tubing (included with unit) to compression fitting located on right 
side of control valve. 

3.  Remove brine tank cover or salt compartment lid. 
4.  Remove cap from brine well. 
5.  Insert opposite end of brine line through outer hole in brine tank.  
6.  Connect brine line to compression fitting on safety brine valve located inside brine well. 
7. 

Install 1 / 2” I.D. drain line 90 elbow on outside of brine tank. 

8.  Run the opposite end of brine tank drain line to a suitable drain. 
 

NOTE :

  The brine tank drain line is gravity flow and must discharge below the overflow fitting. 

CAUTION : 

 

DO NOT “TEE” to the main drain line from control valve.

 

 
NOTE : 

The brine overflow is provided as a back up in the event the safety float shut-off should fail, allowing the brine 
tank to overfill. This drain connection would then carry the excess water to the drain and prevent flooding of the 
floor. Therefore, no liability will or can be assumed by the manufacturer of the softener should this occur. 

 

– Electrical Connection – 

 
1.  Plug the cord from the control valve into a standard 115 volt / 60 Hz receptacle. 
 

NOTE :

 

DO NOT

 plug into an outlet controlled by a wall switch or pull chain that could inadvertently be turned off. 

 
2.  For your protection, this unit is equipped with a 3-prong plug and should be plugged into a grounded receptacle. If the 

receptacle is designed only to accept 2-prong plugs, obtain a 3-prong adapter and secure the ground wire to the 
receptacle plate mounting screw. 

 

WARNING :  DO NOT remove grounding plug! An improperly grounded unit could cause injury from electrical 

shock!

 

– Pressurizing The System – 

 

1.  The control valve 

must be in the SERVICE position!

 The word SERVICE is imprinted in the notch on the manual 

regeneration knob.  

 

WARNING :  NEVER turn regeneration knob counter clockwise as this will cause damage to the control valve! 

 
2.  Slowly rotate handle of the bypass valve to the SERVICE position. 
3.  Open the nearest faucet to evacuate air from plumbing lines. 
4.  Check for leaks! 

– Control Valve Operation –

 

 

Each control valve position can be manually selected by rotating the regeneration knob CLOCKWISE 

until the desired position appears in the knob notch. 

 

1.  Manually index regeneration knob to 

BACKWASH

 position and allow water to run to drain for 3-4 minutes or until 

clear. 

2.  Manually index regeneration knob to 

BRINE REFILL

 position and allow the brine tank to fill just over the salt grid 

plate. 

3.  Manually index regeneration knob to 

BRINE & RINSE

 position and allow the control valve to draw water from the 

brine tank until the water stops flowing. 

4.  Manually index regeneration knob to 

BRINE REFILL

 position and allow softener to refill brine tank. The valve will 

return to the SERVICE position when finished. 

Содержание Waterlogix WLS-075

Страница 1: ...dential Water Softener Waterlogix WLS 075 Waterlogix WLS 075C Waterlogix WLS 100 Waterlogix WLS 100C Waterlogix WLS 150 Waterlogix WLS 200 US Water Systems Inc 1209 Country Club Road Indianapolis IN 4...

Страница 2: ...his process is called Ion Exchange Over time the sodium ions used for the exchange process become depleted and must be replenished The water softener provides a Regeneration process whereby brine solu...

Страница 3: ...Installation Procedure Filling the Tank with Media Your new softener may or may not have the media in the tank It will depend on the size of the unit and where it is shipped from If your softener doe...

Страница 4: ...installed at the factory The bypass valve allows hard water to be manually routed around the softener 1 Position softener at desired location for installation 2 Turn OFF main water supply and OPEN nea...

Страница 5: ...y the manufacturer of the softener should this occur Electrical Connection 1 Plug the cord from the control valve into a standard 115 volt 60 Hz receptacle NOTE DO NOT plug into an outlet controlled b...

Страница 6: ...milligrams per liter and multiply that by 4 Add that figure to your hardness level GPG and that will give you a compensated hardness level Example Your hardness is 25 GPG and your iron reading is 1 5...

Страница 7: ...850 gallons the wheel will be just past 8 on the second mark for 50 The interval between the two digit numbers is in 25 gallon increments Setting The Time Of Day 1 Depress the button on left side of...

Страница 8: ...solar salt will suffice If iron is present in the raw water use of iron inhibiting salt is recommended The salt level will decrease after each regeneration cycle Consequently the salt compartment will...

Страница 9: ...to iron manganese and chlorine levels greater than 1ppm are expressly not covered by this warranty Labor is not included Warranty is limited to repair or replacement of defective part manufacturer s...

Отзывы: