6
DS1750-003A
DESCRIPTION OF TERMINALS
]
LINE IN
System bus connection
]
CP
Floor call
S+
}
Call repetition
S-
INSTALLATION
Fix the bracket to the wall using a box 503 and the screws provided or a Ø 60 box with suitable
screws.
Program the dip switches.
Connect the wires from the system to the terminal board.
Couple the monitor to the bracket and lock it by screwing fastening screws A.
1,40 m
503 box
Ø 60 box
1,40 m
1,40 m
A
Ø 4 mm max
slotted head or
Phillips cross head
A
•
•
•
•