2
Roost Assembly (Coop Top Part 1)
Fig 1
Attach four D3 lift bar brackets and one D4 lift bar (shorter) onto B2 and B3 roost ends as shown using three
E1 brown screws for each bracket (one for bottom and two for sides).
Door end is marked “Door.” It will be the
name board end if you ordered engraving for your coop.
attaching
Fig 2
Attach B1 roost wing sides to the B2 and B3 roost ends using four E1 brown screws on each end
ends marked door to the B2 door end panel also marked door.
Run Assembly (Coop Bottom)
1
Pick a level place for assembly.
Attach slanted run sides A1 to run ends A2 and A3 as shown (Fig 1) using 2 Brown
E1 Screws and larger T25 provided screw bit F1 in pre-drilled holes on each end (Fig 2). Panel MUST be flush on top
edges (Fig 3) and will extend below at bottom a little to rest into ground.
Attach panel ends marked “Door” to door end
with beveled edges on top of panel. REMOVE SHIPPING SCREW THAT HOLDS DOOR IN PLACE WHEN DONE.
© Urban Coop Company, all rights reserved.
Fig 1
Fig 1
Fig 2
Fig 2
Fig 3
*Tip
Only tighten
screws as much as
needed to pull the
two pieces together
and don’t bury
the head too
much.
Beveled
Edge
BOUGHT AN EXTENSION?
See step X1 in run extension section.