background image

© Urban Coop Company, all rights reserved.

Fig 1

Fig 2

Fig 3

Fig 1 

If you ordered your feeder at the time of your coop purchase omit step one, as we will have cut opening for 

you. If not, cut out a pattern of squares in the wire on either end of the left side of the coop. The square should be 

5” 

wide x 10” tall  (keeping in mind one wire hole is ½”x 1”) starting 6 inches (6 openings) up from the bottom

. Use 

strong wire cutting pliers as the wire we use is very tough.

Fig 2 

Place the feeder into the hole, and install provided hasp and clip as shown as security against a predator 

knocking over and pulling out feeder, resulting in a large, exposed hole. Use small phillips screws and clip in your kit.

Optional Feeder Install

10

Optional Waterer Install

Fig 1

Fig 2

Optional Waterer Installation

Fig 1

 If you ordered your waterer at the time of your coop, we have cut out the install hole for you.  If not, 

starting 3” from the top (closest hole), cut out 1 full width of wire and 5” down so that the D1 waterer bracket can 
be inserted as shown and screwed to panel rail using two E2 green screws.

Fig 2

 All coops have a waterer hole, but if you did not order your waterer at the time of your coop, you will need 

to remove the wire that is covering the hole. We install it using shorter staples, so pliers should be able to pull it 
out from the back side. Force fit nipple into waterer grommet at far end, then carefully pass waterer through 
hole. Hang far end of waterer into bracket capturing the end cap behind the bracket against back wall. Fill. :)

11

See detail Y1 on next page 

for instructions on inserting nipple 

into the tube.

Содержание Round-Top Mobile Chicken Coop

Страница 1: ...a part was damaged in shipping or we forgot to package a needed part contact us and we will FedEx a replacement part to you There are also helpful assembly videos that can be found on the product page of your coop at and you can of course contact us at 877 741 2667 www urbancoopcompany com We can solve most issues you might have over the phone Urban Coop Company TM Find your inner farmer Assembly ...

Страница 2: ...e coop cleaner as needed Glues used in all joints are completely waterproof and all metal parts are galvanized or have exterior rated coatings Clean coops make for happy healthy hens Placement Easy access to water and clear access to egg door is recommended Flat level high ground is best Some sunlight is not all bad The Galvalume roof does a good job at not transferring heat and provides shade Sun...

Страница 3: ...g Box Sides 2x A2 Back A3 Front Run Panels Kims Hen House B2 B3 Roost Ends Egg Box Parts C3 Entry Exit Board C2 Bottom Parts B6 Galvalume Roof Panel D5 Egg Box Valence D1 Optional Waterer and Waterer Bracket D3 Lift Bar Brackets 4x B5 Eave Boards 4 x58 2x Top rail is beveled A large square hole is in the left panel A small slit is at the back of the right Do or Do or Do or Do or C1 Front D2 Option...

Страница 4: ...Coop Bottom 1 Pick a level place for assembly Attach slanted run sides A1 to run ends A2 and A3 as shown Fig 1 using 2 Brown E1 Screws and larger T25 provided screw bit F1 in pre drilled holes on each end Fig 2 Panel MUST be flush on top edges Fig 3 and will extend below at bottom a little to rest into ground Attach panel ends marked Door to door end with beveled edges on top of panel REMOVE SHIPP...

Страница 5: ... or out to align as needed before driving in screws Urban Coop Company all rights reserved Fig 1 Squaring suggested Fig 1 Your coop is likely square but it s good to check Using a measuring tape measure the inside distance from corner to corner of the roost and rack the coop as needed to make the distance the same If you own a square that will fit into the roost area and know how to use it place i...

Страница 6: ...behind inserting screws in pre drilled holes Orient as shown C3 C1 C2 Side C2 Bottom Urban Coop Company all rights reserved 5 Install C2 Into Coop Prior to putting on roof Fig 1 Lower bottom of C2 assembly into door end of roost Fig 2 Drop C2 assembly down to where the top edge is flush with lower rail of B1 roost side and back edge tight against B2 roost front wall Fig 3 C2 bottom forms the door ...

Страница 7: ...nd pre drilled holes affix C1 egg box front assembly by screwing through holes on outer rails of B1 roost side driving screws into sides of C1 Fig 1 Fig 2 Fig 3 Top Screw Bottom Screw C1 Sticks up OK 7 Urban Coop Company all rights reserved Roost Bars Install Fig 1 Lower B4 roost bars longer down through the roost top Using one E1 brown screw on each end screw through bottom rail of B1 roost side ...

Страница 8: ...ards Roof Install 9 CAUTION Any metal roof panel may have edges that are sharp enough to cut you Be careful Fig 1 Attach one edge of the B6 Galvalume roof panel onto one of the B5 eave boards centering it from end to end Using E3 rubber clad washer screws and the bit holder attach one edge of panel to eave taking care to make sure roof lays down smoothly Gently roll roof over to other side positio...

Страница 9: ...er Install 10 Optional Waterer Install Fig 1 Fig 2 Optional Waterer Installation Fig 1 If you ordered your waterer at the time of your coop we have cut out the install hole for you If not starting 3 from the top closest hole cut out 1 full width of wire and 5 down so that the D1 waterer bracket can be inserted as shown and screwed to panel rail using two E2 green screws Fig 2 All coops have a wate...

Страница 10: ...wn in photo Fig 1 While supporting the waterer make sure the black rubber grommet is firmly seated into the pre drilled hole in the waterer Twist a little to seat it well if needed Fig 2 Firmly push the end of the poultry nipple with smaller diameter into the rubber grommet completely It may be necessary for you to smear a thin coating of Vaseline or vegetable oil onto the nipple so that it can be...

Страница 11: ...reserved Urban Coop Company all rights reserved Extension On New Coop Simply replace the A2 back run panel shown in the main coop assembly step 1 with the X2 thru panel from the extension kit so that there is a passage out the back of your coop into the run extension You ll use the A2 back run panel as the back for your extension Extension on Existing Coop Remove the six E1 brown screws that hold ...

Страница 12: ...es of the A2 back run panel now your back run extension panel Fig 2 Using two X4 brown screws attach A2 back run panel to X1 extension side panel via pre drilled holes Repeat for other side X2 Using eight X4 brown screws into the pre drilled holes attach X3 top panel wire side down to the side and back assembly Move top around on assembly as necessary to make all edges flush This will control the ...

Страница 13: ...2 First align one side of the extension and fold one X5 hasp over to where it will meet up to the eye bolt correctly Using a pencil or pen mark holes in the X5 hasp Using X6 gold screws and the T20 bit attach hasp Fold the hasp over onto the eye bolt and install the provided spring clip lock Repeat for the other side X4 Extension can be removed using clips so that you can relocate your coop whenev...

Отзывы: