- The battery is necessary to use the system in a safe way. The battery is 
recharged by system board.
- The placing of the lead-acid battery 2 Ah DC 12 V is under the heat
exchanger, in flat position with poles facing the plastic cover.
- In order to accede to the battery case is necessary to remove the frontal 
cover.

7

            MAINS POWER AND POWER SUPPLY CONNECTIONS

Mains power (110V or 230V ) source supplies energy to the heating system and to the internal power supply. A DC 12v 2.0Ah battery  
(not included ) must be connect to the recharge circuit to allow unit to shoot even without mains power. The heating element is of 180W, 
at the heating startup the power consumption is about 170W and in some minutes it goes down. The average consumption range is from 
around 37 W (Modular 2) to 53 W (Modular 8). Ambient temperature and battery loading can influence the average power consumption.

Do not use inverter or UPS if you are not sure that they generate a true sine wave,  not a rebuilt one. Please refer to the UPS 
manufacturer the correspondance of such features before proceeding with the connection.

-The max current to be considered for the system is 3,15A
-The connection to the electricity grid (110v or 230V ) must be performed by a qualified technician.
-Connect the equipment to the electricity grid only after you have completed the installation.
- It is necessary to connect the ground terminal. 
- The system must be connected to the mains trough on automatic switch (automatic switch, curie C, with I

h= 

10 A and I

dif= 

30 mA,...) 

with breching capacity based on the assumed fault current of the fogging system in the sampling point.

PLEASE NOTE THAT, AS ALL POWERED EQUIPMENT FROM THE ELECTRICITY GRID REQUIRING INSTALLATION,
IT IS SUBJECT TO COMPLIANCE WITH RULES OF THE COUNTRY IN WHICH IT IS INSTALLED

For section and types of wires, fuses, suitability of materials to installation sites etc..

REPLACE FUSE ONLY USING SAME TYPE ,FOLLOWING THOSE SPECIFICATIONS:
CERAMIC BODY FILLED WITH QUARTZ, REF. STD. EN60127-2-3/DIN41660 3,15Ah (EXAMPLE OMEGA GT520231)

 

1

  - Power supply main connections

 

2

  - Mains power

 

3

  - Ground connection

 

4

  - Battery holder (battery not included)

1

2

3

4

4

14

12 

 

                  FRONT LEDS MEANING

RED LED 

(right)

ON: 

Error (Empty bag or low fluid , Mains power off/Battery low) or Fault

OFF : No error condition

 

BLU LED

 

(center)

ON: 

Unit is armed and ready to shoot (with green led ON).

OFF: 

Unit is disarmed , shot not possible.

      

GREEN LED

 (left)

ON:

 

Unit has reached the correct temperature

OFF: Unit in warming condition, no shot possible

.

 
The top right RED led light (DL1) means unit is powered on. The RED FAULT led (DL7)
 is located in the middle of the board. 

EMPTY BAG

ARMED AND

READY

WARMING

Содержание Plus Series

Страница 1: ......

Страница 2: ...e automatically accepted by breaking the security labels on the product 1 PACKAGE CONTENT Inside the package you will find 1 The Unit Modular CPlus 2 One 750 ml bag Optional 1000 ml 3 A window label to indicate the device installation 4 Installation and use manual 2 19 WARNING All UR FOG fogging systems should only be used with UR FOG branded flu ids It is strictly forbidden to use any fluid not p...

Страница 3: ...eason you swallow fog fluid or if after contact with eyes or skin you have any kind of reaction and in any case wash it immediately with water and soap Do never stay for a long time in a room filled with fog Do not use charged bags that are not the ones suggested by UR Fog and never try to recharge them they are made for a single use Follow your national rules for the dispose of empty bags Keep UR...

Страница 4: ... 5 meters not to let it be reached avoiding possible tampering 15 The unit has a nozzle inclination of 15 oriented to the floor 16 The main body of UR Fog which has the heating system enclosed inside a metal frame should not be opened unless by specific and authorized service centers Do not open and touch for any reason the insulation before 24 hours the unit has been shut off The internal part ma...

Страница 5: ... minutes 140 minutes 150 minutes 37 41 W 42 47 W 42 47 W 48 53 W 1 4 A 1 7 A 1 9 A 2 1 A microswitch microswitch microswitch microswitch Yes Yes Yes Yes LAN WIFI board support Yes Yes Yes Yes Yes 16 14 DEFECTS POSSIBLE SOLUTION DEFECT FOUND POSSIBLE CAUSE POSSIBLE SOLUTION Disturbance interference or potential differences between devices In the evenience of high noise on mains power lightings an e...

Страница 6: ...to the following parts by skilled operators 1 Verify battery and power supply status 2 Verify screws are firmly closed 3 Verify the output nozzle is not damaged and without anyting inside 4 Verify pneumatic circuit 5 Verify once a year liquid pump BATTERY AND POWER SUPPLY CHECK Verify that the output of the power supply without any load battery unplugged is 14 1 V on the PSU and 13 8 V on FASTON b...

Страница 7: ...a qualified technician Connect the equipment to the electricity grid only after you have completed the installation It is necessary to connect the ground terminal The system must be connected to the mains trough on automatic switch automatic switch curie C with Ih 10 A and Idif 30 mA with breching capacity based on the assumed fault current of the fogging system in the sampling point PLEASE NOTE T...

Страница 8: ... and will work in parallel with the commands received by the serial interface In no case a voltage greater than the board s power supply should be applied to any pin of this port except for relay outputs that can manage up to 60V 500mA Some interface options depend on S3 Dip Switch configuration and W1 and W2 jumpers Fig 2 shows their position on the board FUNCTION DIP SWITCH fig 1 Tab 1 13 11 INS...

Страница 9: ...stem is activated by an event detected by an area or sensor Please note that is ARM costant signal is removed during the shooting the units immediatly stops fog emission Optional shooting methods There are also some other activation methods on Modular Plus series some of them depending also from other optional devices that let the installer able to satisfy the most common customer s requests A Add...

Страница 10: ...E MODULAR 3 PLUS max 40 sec m to protect Seconds of emission m to protect Seconds of emission m to protect Seconds of emission 50 150 7 150 450 21 300 900 40 75 225 9 200 600 28 100 300 14 250 750 35 RECOMMENDED SHOOTING SECONDS ACCORDING TO THE VOLUME SPACE TO PROTECT m3 Fogging systems Modular CPlus are able to produce fog continuously till the maximum time allowed according to the model specifi...

Отзывы: