© UPLIFT Desk
• 1-800-349-3839 • [email protected] • www.upliftdesk.com
5
F.
Slide Crossbar rails (part 5) back into Crossbar
ends (part 4). Ensure the slots of the Crossbar rails
are facing inward. The slot on the Crossbar rail is
offset; it will need to be aligned in a specific way to
allow for the already installed Machine screws. Make
sure that the Crossbar rail can slide all the way to
the end of the Crossbar end. If it doesn’t fit, take the
Crossbar rail out and flip it over, with the slots facing
inward and near the top of the edge, further from
the floor.
H.
Attach each Foot (part 2) to the 2-leg
assembly and the Small foot (part 3) to the
one-leg assembly with the Zero Crossbar
Bracket with qty 4 Machine Screws (part 13)
each, and tighten bolts in a cross pattern.
I.
Your UPLIFT Eco Corner desktop is pre-
drilled with threaded inserts. Place the desk-
top on a clean surface on the floor, with the
pre-drilled holes facing up, and carefully line
up the holes in the frame with the holes on
the desktop.Adjust the width of the two-leg
assembly if needed.
4
4
5
2
3
13
J.
Insert and tighten eight (8) M6x10
Machine screws (part 14) into the Crossbar
ends (part 4), to secure the rails in place.
K.
Ensure that the base is lined up with the
threaded inserts in underside of the desktop.
Proceed with securing the desk base to the
desktop using fourteen (14) of the 10-1/2’’
Machine Screws (part 15).
Install as follows:
3 per Side bracket
6 total
1 per Crossbar end
2 total
6 for the Zero Crossbar Bracket
14
15