© UPLIFT Desk
• 1-800-349-3839 • [email protected] • www.upliftdesk.com
3
part Description
Qty
Leg 2
Foot 2
Crossbar end
2
Crossbar rail
2
Side bracket
2
Adhesive pads
10
Control box
1
Keypad 1
Leveling studs
(pre-installed in feet)
4
Cables
(Power & two connector wires)
3
M6x14 Machine screw
24
M6x10 Machine screw
8
#10x1/2 Machine screw
(not pictured)
8
#10x5/8 Wood screw
(not pictured)
4
Cable clips
(not pictured)
10
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
or
1
1
2
2
3
3
4
5
5
6
8
12
12
12
13
13
12
12
13
7
Foot
(qty 2)
Leg
(qty 2)
Crossbar rail
(qty 2)
Adhesive pads
(qty 10)
Control box
(qty 1)
Side bracket
(qty 2)
Leveling stud
pre-installed
(qty 4)
1
2
4
3
5
6
8
M6x14
Machine screw
(qty 24)
M6x10
Machine screw
(qty 8)
#10x1/2
Machine screw
(qty 8)
#10x5/8
Wood screw
(qty 12)
Cable clip
(qty 10)
10
13
12
11
Please count all pieces before disposing of any carton or packing material. Use a padded or carpeted
area for assembly to avoid damage. For ease and safety, we recommend two people for assembly.
10
7
Crossbar end
(qty 2)
Keypad
one of two types
(qty 1)
9
Cables
(qty 1 power cable and
2 connecting cables)
or
Philips Head Screwdriver and/or Power Drill
Tape Measure
Allen wrench
(included)
Tools required
Components
x2
3.
PARTS LIST
14
15