Page 21
VISION FULL TOUCH CONTROL PANEL
Once the electrical connection is completed (see page 49), at the first power supply wait about a minute to
load the software. When the operation is completed the button
will light indicating the possibility to turn
on the control panel. Press and hold the button for 3 seconds to turn on the oven.
Note: the software
loading operation occurs every time the machine is re-powered after a prolonged interruption of
electrical supply.
Now the Vision control panel is operating with the home screen below:
To interact with the interface, touch on the display the icon corresponding to the desired function.
Alternatively, press the buttons
to access the menus indicated by their icon above.
To regulate the setting of the numerical parameters of every option to be set, scroll the further icons’ pages
(where available) and scroll the recipes books’ pages; touch the corresponding icon or area and scroll from right
to left up to the desired values.
Alternatively, use the Slider
scrolling from right to left up to the desired values.
To pass to another function, touch on the display the icon corresponding to the new function.
Alternatively, use the arrows buttons
and
to pass to a function previous or following to the current one.
To confirm a setting or a parameter, press again the icon corresponding to that setting or to that parameter.
Alternatively, confirm every setting with the button
.
Содержание RDR-GAS
Страница 1: ...RDR GAS ROTATING DOUBLE RACK BAKERY OVEN ...
Страница 8: ...Page 8 VIEW OF THE EQUIPMENTS VOLUMES AND CONNECTIONS OF GAS VERSION OF UNIT RDRG ...
Страница 40: ...Page 40 ELECTRIC DIAGRAM ...
Страница 41: ...Page 41 ...
Страница 42: ...Page 42 ...
Страница 43: ...Page 43 ...
Страница 47: ...Page 47 Phone 603 458 7690 Address P O Box 1062 Windham NH 03079 ...