©United Surface Solutions • 11901 Burke St, Santa Fe Springs, CA 90670 • (877) 837-4623 • deburring.com
premature bearing failure. The warranty stands in effect only when the CPC is on the isolation pads. If the CPC
is bolted to the floor, the warranty on bearings, barrels and belts will be void.
1.6 Facility Interconnect
Below is the facility interconnect plate on the rear of the machine used to interface with your facility.
Power In
3/4”
Air In (CPC4000FA Only)
3/8”
Water In
3/4”
Содержание CPC4000
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......