1.0 Receiving Equipment & Setup 

1.1 Inspection 

Upon receipt of the Centrifugal Barrel System with integrated Computerized Process Controller (CPC), please 
perform a thorough inspection of the shipment. Compare what is received to the packing list to be sure all the 
components, including any ordered supplies are present. Check for any damage to the equipment. If damage is 
found, notify the delivering freight company and UNITED SUR FACE SOLUTIONS, LLC immediately. 

1.2 Selecting Equipment Location 

The equipment should be conveniently located to the “flow of parts.” The CPC System will require the 
appropriate electrical power. If a sump system and water recycling unit is to be used, separate power must be 
provided for those units as well. It is suggested to leave at least two (2) feet on each side of the machine for 
maintenance purposes. Sufficient work and storage space is also required. 

1.3 Isolation Pads 

While setting up the CPC, make certain that high-capacity rubber isolation pads 
(rated at a min. of 1500 psi) are installed under each leg of the unit. These pads 
are used to level the equipment and will extend the service life of the machine. 
The leveling procedures will be explained later in this section. 

1.4 Electrical 

With the CPC in position, a licensed electrician will be required to connect electrical power. The power 
requirements for your new equipment are printed on the data plate, which is located on the right side panel. 
Refer to included schematics for setup details. UNITED SURFACE SOLUTIONS, LLC personnel are not authorized 
to make connections to your building’s electrical system. Likewise, non-UNITED SURFACE SOLUTIONS 
personnel are not authorized to make any modifications or adjustments to the equipment without written 
authorization. Doing so may compromise operator safety as well as your warranty.

  

Caution: Be sure to connect only the specified voltage to the machine. These systems are built with 
standard voltage 230VAC / 60Hz. Applying improper voltage will result in severe damage to the system 
and will void the warranty. Inspect the motor and AC drive to confirm the rated voltage.

 

 

1.5 Leveling 

Once the electrical connections have been made, it will be necessary to level the unit. Do not skip this step of 
the setup process. This unit uses a fluid mass of media to finish your parts and if the machine is not level, this 
fluid mass will favor one side of the barrel, effectively reducing the available working volume of the barrel. This 
may result in an increase in part-on-part damage. 

1.

 

Install High-Capacity Rubber Isolation Pads (rated at 1500 psi) under each leg of the unit. 
Recommended pad size is 3” X 3” X ¼”. 

2.

 

Place a magnetic beam level on the center beam.  

3.

 

If adjustment is needed, shim under the isolation pad with varying thicknesses of sheet metal. If 
large adjustments are necessary, use thicker padding 

DO NOT BOLT DOWN SYSTEM. The CPC uses a rotating turret that puts stress on the machine. Being on 
isolation pads, the machine is allowed to “flex” and absorb this stress. If the machine is bolted down and not 
allowed to flex, additional stress would be placed on the bearings. The added stress on the bearings will cause 

Содержание CPC4000

Страница 1: ...United Surface Solutions 11901 Burke St Santa Fe Springs CA 90670 877 837 4623 deburring com CPC4000 Operation and Maintenance Manual...

Страница 2: ...be indicated by the activities described herein and to avoid all potential hazards By following the instructions contained herein the user willingly assumes all risks in connection with such instruct...

Страница 3: ...5 Leveling 4 2 0 Overview 6 2 1 Specifications 6 2 1 Dimensions 7 2 2 Main Components 8 3 0 Operation 9 3 1 Applying Power 9 3 2 Main Menu Error Bookmark not defined 3 3 Auto Operation 9 3 3 1 Enterin...

Страница 4: ...e panel Refer to included schematics for setup details UNITED SURFACE SOLUTIONS LLC personnel are not authorized to make connections to your building s electrical system Likewise non UNITED SURFACE SO...

Страница 5: ...stands in effect only when the CPC is on the isolation pads If the CPC is bolted to the floor the warranty on bearings barrels and belts will be void 1 6 Facility Interconnect Below is the facility in...

Страница 6: ...10HP three phase AC motor inverter controlled Turret Speed Range 0 225 RPM fully adjustable Barrel Rotation Ratio 1 1 Barrel Construction Stainless steel with removable urethane lining Machine Enclos...

Страница 7: ...Surface Solutions 11901 Burke St Santa Fe Springs CA 90670 877 837 4623 deburring com 2 1 Dimensions Width 86 75 2 20m 134 75 3 42m with clearance Depth 50 5 1 28m 74 5 1 90m with clearance Height 58...

Страница 8: ...St Santa Fe Springs CA 90670 877 837 4623 deburring com 2 2 Main Components 10HP Motor Jog Button E Stop Electrical Panel Turret Barrel Barrel Lid Separator Touch Screen Door Jog Motor Drive System Ur...

Страница 9: ...etting Manual Process Parameters After selecting MANUAL OPERATION from the Main Menu the Manual Operation screen will appear et the RPM by pressing the RPM field and entering a value then press ENT Se...

Страница 10: ...the cam in a downward manner using the tool provided WARNING Barrels may become pressurized Some processes can generate super heated steam in as little as 10 minutes Open slowly use caution Closing Ba...

Страница 11: ...type the height of the media measured as inches below the top of the barrel and press ENTER Example MC CACC 18x1132 2 If two types of media are used enter Media Type B Press CONTINUE The Compound Dat...

Страница 12: ...load each barrel with the correct amount of compound water media and parts To load a barrel first remove it from the cradle Do this by pulling the pin rotating the lockbar and pulling it out To open a...

Страница 13: ...t 5 0 Maintenance 5 1 Preventative Maintenance Schedule Every Shift Inspect and Lubricate Lid Lock Cams Inspect Lid Seals First 25 Machine Hours Inspect turret belt and tighten as needed Inspect barre...

Страница 14: ...nspect the sprocket for wear Replace Bearing Sprocket Assemble if necessary Torque sprocket retainer nut to 50 ft lbs 7 Remove the chain by means of the master link Clean with mild solvent if necessar...

Страница 15: ...ring to be replaced is conveniently located and set the motor brake 5 Remove the two 2 retaining bolts holding the idler arm assembly in place and remove the Idler arm from the turret 6 Loosen the set...

Страница 16: ...ring to be removed and slide it off the shaft If replacing the bearing on the Drive Side loosen the Sprocket Setscrews and remove both sprockets followed by the bearing 13 Install the new Turret Beari...

Страница 17: ...ower Supply on the PLC also powers the Interface If there is power to the Drive Inverter and not to the PLC first check fuses then replace the Power Supply if needed No input voltage Check that the ma...

Страница 18: ...lem Item to Check Remarks No power to the machine Verify that the Power Indicator is lit Follow the procedures under Interface Not Functioning Drive error or overload Check Drive Keypad for error code...

Страница 19: ...ons on the sealing surfaces Review the section Closing Loading Barrels for procedures to eliminate this problem Process too hot Verify that the process is not building up significant heat and pressure...

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ......

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ......

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ......

Страница 37: ......

Страница 38: ......

Страница 39: ......

Отзывы: