background image

SAFETY INFORMATION

Be sure to read the entire owner’s manual prior to installing and operating this Pellet heater.  Failure to follow these instructions 

could result in fire, property damage, bodily injury or even death.

This stove’s exhaust system works with negative combustion chamber pressure and a slight positive chimney pressure, it is 

extremely important to ensure that the exhaust system is sealed and airtight. The ash pan and viewing door must be securely 

fastened in order for the unit to be airtight. This Pellet heater will not operate using natural draft or without a power source for 

the blowers.

The use of grates or other methods of supporting the fuel is not permitted.

This Pellet heater is designed to burn pellet wood fuel only. Do not use any other type of fuel; doing so will void any warranties 

stated in this manual. 

THE USE OF SOLID WOOD FUEL IS PROHIBITED BY LAW.

This Pellet heater is designed for residential installation according to current national and local building codes. It is also 

approved as a mobile home heater, which is designed for connection to an outside combustion air source.  When installing 

a Pellet Stove in a mobile home, it must be electrically grounded to the steel chassis of the home and bolted to the floor.  

Make sure that structural integrity of the home is maintained.

Make sure that structural integrity of the home is maintained when passing vent pipes through walls, ceilings and roofs

It is recommended that the exhaust vent be cleaned bi-annually or after every two tons of pellets.

Soot or creosote may accumulate when the pellet heater is operated under incorrect conditions, such as an extremely rich 

burn (black tipped lazy orange flames). Do not operate the stove if the flame becomes dark or sooty or if the burn pot overfills 

with pellets. Turn the stove off and call your dealer.

The grounded electrical cord must be connected to a standard 120 volt, 60 hertz electrical outlet. Ensure that the electrical 

cord is not trapped under the appliance and that it is clear of any hot surfaces or sharp edges.

The ash pan and viewing door must be locked securely for proper and safe operation.

DO NOT PLACE UNBURNED OR NEW PELLET FUEL IN THE ASH PAN. A fire in the ash pan may occur.

Do not operate your pellet heater if you smell smoke coming from it. Turn it off, monitor it and call your dealer.

Repair and servicing of your U.S. Stove Pellet Burning Room Heater may only be done by a qualified technician.

Disconnect the power cord before performing any maintenance or repair. 

NOTE: Turning the Pellet Stove Room Heater to "off" does not disconnect power from the unit.

The Pellet Stove Room Heater will not operate during a power outage. If a power outage or tripped circuit occurs, check for 

smoke spillage and open windows or doors to ventilate as necessary.

4

Содержание 5560 (I)

Страница 1: ...ay result For everyone s safety FOLLOW all Installation and Operating Directions Never use makeshift compromises during the installation of this appliance Contact your local building or fire officials...

Страница 2: ...Instructions 8 9 Thermostat Installation 10 Clearances to Combustibles 11 Installing Your Room Heater 12 19 Mobile Home Installations 20 Insert Pellet Stove Installation 21 24 Vent Termination Locatio...

Страница 3: ...r by 1 1 2 length Ash Content 1 Maximum Premium grade 3 Maximum Standard grade Moisture Content 8 Maximum Heat Content Minimum 8 200 btu s per hour It is important to note that the ash content of the...

Страница 4: ...is maintained Make sure that structural integrity of the home is maintained when passing vent pipes through walls ceilings and roofs It is recommended that the exhaust vent be cleaned bi annually or a...

Страница 5: ...ower outages with battery backup or room air starvation occurs during operation of heater smoke in the house may result This may trigger smoke detectors if they are installed CAUTION DO NOT CONNECT TO...

Страница 6: ...s per hour or 5 1 lbs of fuel per hour Hopper Capacity 55 lbs Dependent upon quality and heating value of pellet fuel DIMENSIONS Figure 1 6 00 in 152 4 mm 13 70 in 348 mm 20 50 in 520 8 mm 10 50 in 26...

Страница 7: ...IMENSIONS continued The minimum installation dimensions of the insert opening are 32 813mm wide x 22 3 4 578mm high x 12 1 4 311mm deep Figure 2 7 10 3 4 11 1 2 13 11 16 39 7 8 29 7 8 23 1 8 3 7 16 20...

Страница 8: ...uel in the auger press and release the On Off button The LED indicator light above the On Off button will alternately flash green then red to indicate that the start up cycle has begun The light above...

Страница 9: ...then Automatically Initiate the Normal Ignition Cycle NOTICE Do not use this procedure for normal startup To do so would cause excessive fuel build up in the burn pot AUGER TRIM Button This Button is...

Страница 10: ...terminal on the rear of the control panel see Figure 4 If you have installed a remote thermostat for your pellet stove and wish to have the heater controlled by that thermostat depress the MODE butto...

Страница 11: ...d be installed under the heater The non combustible hearth pad must extend at least 6 beyond the fuel loading and ash removal openings and at least the depth of the heater plus 6 inches 152mm out in f...

Страница 12: ...s not interfere with the house framing wiring etc 2 Install a non combustible hearth pad underneath the pellet stove This pad should extend at least 6 152mm in front of the unit 3 Place the pellet sto...

Страница 13: ...by Pellet Vent Mfg Combustion Air Intake 6 152mm Clearance to Combustibles Floor Protector 6 152mm Clearance Front Figure 9 6 152 mm Clearance Wall to Back of Unit Wall Thimble Exhaust Vent 45 Elbow...

Страница 14: ...rough the wall 5 Secure all vent joint connections with 3 screws Seal the exhaust vent joint connections with high temperature silicone sealant 6 Install the combustion air intake pipe 7 Install a tee...

Страница 15: ...temperature silicone sealant 6 Locate the center of the exhaust pipe at the back of the unit Line up the center with the same spot on the exterior wall a cut a 7 178mm diameter hole through the wall 7...

Страница 16: ...16 INSTALLING YOUR ROOM HEATER continued SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET STOVE HEATERS Images courtesy of Selkirk...

Страница 17: ...17 INSTALLING YOUR ROOM HEATER continued SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET STOVE HEATERS UP AND OUT HORIZONTAL TERMINATION KIT FIGURE 12 Images courtesy of Selkirk...

Страница 18: ...18 INSTALLING YOUR ROOM HEATER continued SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET STOVE HEATERS STRAIGHT OUT HORIZONTAL TERMINATION KIT FIGURE 12 Images courtesy of Selkirk...

Страница 19: ...19 INSTALLING YOUR ROOM HEATER continued SELKIRK DIRECT TEMP VENT SYSTEM FOR PELLET STOVE HEATERS Images courtesy of Selkirk THROUGH THE ROOF VERTICAL TERMINATION KIT FIGURE 14...

Страница 20: ...order for this unit to be installed in a mobile home the following criteria must be met The unit must be secured to the floor using lag bolts in the holes provided in the pedestal base Ensure that the...

Страница 21: ...ll amount of assembly required when installing this model The steps are as follows Note The shroud must be installed before unit is set into its final position Step 1 Shroud Side Facing the back of th...

Страница 22: ...oud side piece and fasten as shown with 4 screws pro vided Step 4 Control Board Take the control board and insert it from the back of the right shroud side facing front of unit Fasten control board in...

Страница 23: ...le layers add R values of each layer to determine the overall R value The R value for the required board is 1 2 Convert specification to R value k factor is given with a required thickness T in inches...

Страница 24: ...to the heater with a hose clamp 6 Connect the heater to the coupling on the bot tom of the exhaust flex vent and twist to the locked posi tion Push the heater into the fireplace to its final posi tion...

Страница 25: ...25 VENT TERMINATION LOCATIONS Figure 22...

Страница 26: ...pot Inspect the burn pot regularly to check that the holes have not become plugged If necessary clean thoroughly It is imperative that the burn pot be re installed the correct way or the unit will no...

Страница 27: ...cial filter or bag to eliminate leakage 5 Remove ash pan and dispose of ashes into metal container 6 Reinstall ash pan 7 Reinstall burn pot and burn pot liner Ash Removal Insert Unit 1 Allow Heater to...

Страница 28: ...s The fans should be inspected periodically and if any accumulation is present vacuumed clean as the ash or dust can impede the fans performance It is also possible that creosote may accumulate in the...

Страница 29: ...y to maintain good seal Door Glass Removal and Replacement Do not attempt to operate the unit with broken glass Replacement glass may be purchased from your U S Stove Pellet Burning Room Heater Dealer...

Страница 30: ...olts directly to the circulation blower If the blower does not run replace the blower Igniter will not light fuel Check electrical connections including fuse to the igniter Check that the igniter tube...

Страница 31: ...ing air intake may be dirty or partially blocked restricting airflow to the unit The intake butterfly valve might be set at too low position see page 15 Burn pot holes are blocked Let the unit cool an...

Страница 32: ...N MCU 5V 1 2 3 GND THERMOSTAT 4 PIN AC120V 60HZ N L G White Black Orange Green Red Yellow INTERLOCK CIRCULATION EXHAUST IGNITION AUGER 1 3 2 4 5 6 GND Orange Blue Gray Brown VACUUM SWITCH PROOF OF FIR...

Страница 33: ...14 80601 Switch Low Temp 1 3 88066 Gasket Door 6 ft 15 88166 Gasket Exhaust Blower 1 4 891994 Burn Pot 1 16 80602 Blower Exhaust 1 5 88163 Brick Panel Center 1 17 88167 Gasket Convection Blower 1 6 8...

Страница 34: ...IVE THE FULL MODEL NUMBER WHICH IS ON THE NAMEPLATE ATTACHED TO THE HEATER WHEN ORDERING REPAIR PARTS ALWAYS GIVE THE FOLLOWING INFORMATION AS SHOWN IN THIS LIST 1 THE PART NUMBER 2 THE PART DESCRIPTI...

Страница 35: ...___ Reason for Purchase qAlternative Heat qMain Heat Source qDecoration qCost qOther _________________________ What was the determining factor for purchasing your new appliance _______ I have read the...

Страница 36: ...CUT HERE CUT HERE Fold Here Fold Here United States Stove Company P O Box 151 South Pittsburg TN 37380 Fold Here PLACE STAMP HERE...

Отзывы: