9
FORM CIM 0203
.375" – 0.5"
EVAP.
RETURN
AIR
EVAP.
DISCH.
AIR
INSPECTION OF EQUIPMENT
Upon receipt of the unit, inspect for visible or con-
cealed damage. Report any damage to the carrier, and
file a damage claim.
HANDLING
To facilitate handling, the unit is set on a wooden skid
so that it may be picked up with a two-wheel hand
truck or fork lift. Under no circumstances should the
unit be “walked” on the corners of the skid. Use dolly
trucks or pipe rollers to move the unit to its proper
location.
LOCATION
Unit can be installed either as a complete package or
split into two sections. It can be either floor mounted
or ceiling mounted.
Before unit is installed, a thorough study should be
made of the structure. Careful consideration must be
given to location of wiring, condensate disposal,
ductwork and accessibility to the unit for maintenance
and servicing. It is necessary that a minimum clearance
space be allowed on each side of the unit to accom-
modate maintenance and servicing. This minimum clear-
ance must be 18" for the 1 and 1-1/2 Ton units and 26"
for all larger units. Attention must also be given to floor,
ceiling or wall load limitations (See Figures 1 and 2).
Location should also provide for condensate removal,
trapping and disposal.
Discharge Air from condenser coil should be
deflected away from supply air to condenser,
to prevent recirculation. See also “Condens-
ing Section Modification for Outside Instal-
lation” on page 31.
CAUTION: Unit should NOT be located in
space subjected to freezing temperatures.
MOUNTING AND SETTING IN PLACE
Units can be shipped as an integral package with a tie
rail [Items and ; Figures 5, 6 & 7] attached to both
sides of the unit at each of the four mounting chan-
nels.
If unit is not to be split but is to be hung,
do not
remove
tie rail. Use field supplied (3/8" minimum diameter)
hanging rods, with proper washers and locknuts, then
elevate unit to the exact location where it is to be in-
stalled. Fasten the rods securely to the supporting struc-
ture using vibration isolator-type mounts, and level as
required.
If unit is to be floor mounted and not separated,
do not
remove tie rails. Locate on a level pad and secure,
using vibration isolators. See Figures 5, 6 and 7 (pages
6 & 7), Items and .
FIGURE 10: Tilting The Evaporator Section
0008CA
GENERAL INFORMATION
INSTALLATION
1. Air conditioner is shipped assembled and ready
for operation.
2. Unit contains a full charge of R-22 refrigerant.
3. Evaporator section must be mounted so that there
is a 0.375" to 0.5" tilt down toward the conden-
sate drain connection. This is to ensure that the
water drains to the condensate removal point (See
Figure 10).
Содержание 4CA1901
Страница 2: ...2 FORM CIM 0203 ...