Ultra Moto VR Manual
03/03/2020
18
POP plate
R DBV cabinet
L DBV cabinet
Door
Screw hole
Step 8-5 Place POP plate on the POP bracket. Utilize Spanner to tighten 6 flange nuts on
the POP plate.
Step 9 Install DBV box to Middle cabinet (As customer’s requirement).
Kit list:
No.
Name/Spec.
Picture Qty
1
Cross recessed hexagon screw set
M6×10 black
12
Step 9-1 Utilize key to open L DBV door. Utilize Phillips screwdriver to tighten 6 screws to
secure L DBV box to Middle cabinet. Lock the L DBV door.
Note: It is the same installation method on the other DBV box
.
Finish!
Содержание Ultra Moto VR
Страница 1: ...IMPORTANT Operation Manual...
Страница 78: ...Ultra Moto VR Manual 03 03 2020 77 9 27 Decal...
Страница 80: ...Ultra Moto VR Manual 03 03 2020 79...
Страница 90: ...Ultra Moto VR Manual 03 03 2020 89 10 3 Overall Construction...
Страница 95: ...Ultra Moto VR Manual 03 03 2020 94 10 7 Gas Circuit Elementary Diagram...