Ultra Moto VR Manual
03/03/2020
17
Top marquee
Screw hole
POP bracket
Step 8 Install Marquee assembly.
Kit list:
No.
Name/Spec.
Picture Qty
1
Cross recessed hexagon screw set
M6×30 black
4
2
Flange nut
M4
14
Step 8-1 L Marquee: Marquee installation should be moved to the right.
Step 8-2 R Marquee: Marquee installation should be moved to the left.
Step 8-3 Place Top marquee on the L&R marquee and utilize Phillips screwdriver to tighten
4 screws (M6×30) to secure.
Step 8-4 Utilize Spanner to tighten 8 Flange nuts to secure 2 POP brackets to Top marquee.
Содержание Ultra Moto VR
Страница 1: ...IMPORTANT Operation Manual...
Страница 78: ...Ultra Moto VR Manual 03 03 2020 77 9 27 Decal...
Страница 80: ...Ultra Moto VR Manual 03 03 2020 79...
Страница 90: ...Ultra Moto VR Manual 03 03 2020 89 10 3 Overall Construction...
Страница 95: ...Ultra Moto VR Manual 03 03 2020 94 10 7 Gas Circuit Elementary Diagram...