
PART II: INSTALLATION
17
GAS TRAIN CONNECTIONS
Referring to the P&ID of the burner, execute the connection.
Рис
. 5
WARNING: BEFORE EXECUTING THE CONNECTIONS TO THE GAS PIPE NETWORK, BE SURE THAT THE
MANUAL CUTOFF VALVES ARE CLOSED.
ATTENTION: THE BURNED GAS RATE MUST BE READ AT THE GAS FLOW METER.
burner main gas train
connection
pilot gas train connection
1100
580
1
1
0
5
B:
gas supply network
C:
compressed air
A:
”direction” arrows for installation
A
C
B
Содержание URB40
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 42: ...Annex1 Example for motor cable...
Страница 43: ......
Страница 44: ...Annex 2 Example for sensor cable...
Страница 45: ......
Страница 46: ......
Страница 50: ......