PART II: INSTALLATION
16
GAS TRAIN CONNECTIONS
The diagrams show the components of the gas trai included in the delivery and which must be fitted by the installer.The diagrams are in
compliance with the current laws.
Key
Assembling the gas train
Fig. 7 - Example of gas train
WARNING: BEFORE EXECUTING THE CONNECTIONS TO THE GAS PIPE NETWORK, BE SURE THAT THE
MANUAL CUTOFF VALVES ARE CLOSED.
Gas train with valves group MB-DLE (2 gas pressure go pressure switch) + gas leakage pressure switch
(PGCP)
Gas train with valves group VGD with built-in gas pressure go gas leakage pressure switch (PGCP)
1
Filter
6
Butterfly valve
2
Pressure switch - PGMIN
8
Main burner
3
Safety valve with built in gas governor
9
Bellows unit(*optional)
4
Proving system pressure switch - PGCP
10
Manual valve(*optional)
5
Pressure switch - PGMAX(*optional)
10
GAS INLET
SUPPLIED BY BURNER
CONSTRUCTOR
BY OTHERS
GAS INLET
SUPPLIED BY BURNER
CONSTRUCTOR
BY OTHERS
1A
5
1B
4
1C
2
1D
1E
3
Keys
1A..1E
Gasket
2
Gas filter
3
Gas valves group
4
Bellows unit
5
Manual valve
”direction” arrows for installation
gas supply network
Содержание LX60
Страница 35: ...PART IV MAINTENANCE 35 Fig 28 Fig 29 Fig 30 B A C D E...
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 45: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Страница 52: ...8 Parameters level heating engineer...
Страница 94: ...50 ERROR CODE TABLE...
Страница 95: ...51...
Страница 96: ...52...
Страница 97: ...53...
Страница 98: ...54...
Страница 99: ...55...
Страница 100: ...56...
Страница 101: ...57...
Страница 102: ...58...
Страница 103: ...59...
Страница 104: ...60...
Страница 105: ...61...
Страница 106: ...62...
Страница 107: ...63...
Страница 108: ...64...
Страница 110: ...66 Wiring variants for LMV27 2 Fuel meter input 1 Supply fuel meter ConnectorX75 ConnectorX5 02 ConnectionsPmax...
Страница 113: ......
Страница 114: ......
Страница 115: ......