UNIDATA
Unidata Manual 6293 - Precision Water Level Instruments Issue 2.1
14
4 PREPARING FOR INSTALLATION
This section describes:
•
The instrument options.
•
How to connect the instrument to an external UNIDATA logger.
•
How to test the system.
You should assemble and bench test a new system before installing it on site. Testing
should include the logging and recovery of a period of data. This will allow you to
confirm satisfactory operation of the entire system and for the site operators to
become familiar with the instruments and software.
4.1 Controls and Settings
All the controls you need to install and operate the 6541 are accessed by removing
the front cover.
The factory default switch settings are:
•
Display counts up.
•
Counts in (1mm) metric increments.
•
Operates normally.
•
Internal battery is OFF.
4.2 Connecting a Battery Pack
Plug in a model 6901B Battery pack to the socket located on the left-hand side.