background image

8

2.4 - SYSTEM ACCESSORIES

EXPANSION VESSEL

In operation, the volume of oil in circulation varies due to the 

temperature changes.

The increase in diathermic oil volume is around 7% for a tem

-

perature increase of 100°C.

This involves the need to absorb the oil expansions by inserting 

an expansion vessel in the circuit. 

It is good practice that, with system cold, the 

oil occupies at least 1/4 of the expansion ves

-

sel  capacity  to  ensure  an  appropriate  seal 

and, with system hot, does not exceed 3/4 of 

the tank capacity to prevent any overflow.

If it is assumed that the system features are such to make it dif

-

ficult to maintain a temperature sufficiently low in the expansion 

vessel (60 - max 70°C at temperature), we recommend provid

-

ing a heat sink on the connection pipe of the expansion vessel.

The expansion vessels used are mainly of the open type (at

-

mospheric): in this case, they will be placed at a height, so that 

the minimum level exceeds the max level reached by the system 

or the utilities, by at least 1.5 m.

The  minimum  height,  subject  to  exceptions  to  be  examined 

case by case, will be such to ensure a 6 m seal at least on the 

intake axis of the circulation pump.

It will be placed preferably in a ventilated area to avoid the tem

-

perature  increasing  excessively  and  protected  against  water 

infiltration.

When wanting greater pressures in the system, or it is not pos

-

sible for some reason to place the vessel at an adequate height, 

be it only for aesthetic reasons, you can place an expansion ves

-

sel in the boiler room, of the pressurised type. This vessel will be 

pressurised with nitrogen, using cylinders and decompression 

station, and equipment with the necessary safety devices.

The connection pipe to the expansion vessel:

-  must be free of shut-offs

-  must be such to prevent convective motions of the oil

-  must not be insulated.

DIATHERMIC OIL COLLECTION TANK

It is a simple container with a higher capacity than the total of 

the system.

It must be placed outside the boiler room, preferably outdoors 

and  in  ventilated  premises  protected  from  rain,  in  pit  below 

ground level not buried, on floor, or raised. 

If buried, it will be necessary to also adequately lower the load

-

ing height to avoid intake problems. 

In case of landfill, it is mandatory to use a double-wall vessel as 

provided for all flammable liquids.

The system loading pump, with its group of valves, is located 

near the oil storage tank.

SYSTEM LOADING UNIT

It consists in a gear pump coupled to an electric motor, com

-

plete with two-way steel valves.

It must be placed in a position protected from rain and level with 

the collection vessel, in order to facilitate the intake of the pump.

OIL CIRCULATION PUMP(S) UNIT

They are normally single-state centrifugal pumps coupled to the 

motor through a elastic joint.

Everything is assembled on the base which ensures alignment 

of the components.

The pump seal is of the air-cooled type.

SHUT-OFF VALVES

The shut-off valves for diathermic oil systems must have a sphe

-

roidal cast iron body and be fitted with bellow seal.

DIATHERMIC OIL FILTER

Upstream of the circulation pump(s) install a filter for diathermic 

oil with spheroidal cast iron or steel body and with a large mesh 

filter basket.

EXPANSION COMPENSATORS

The expansion compensators must be installed to absorb the 

axial expansions of the pipes due to high operating tempera

-

tures.

The pipes must be suitably bracketed so that the compensators 

can perform their function without the burden of any weight that 

might cause misalignment between the jointed pipes, leading to 

possible failure of the bellows and leaking of oil.

Содержание DIATHER Series

Страница 1: ...INSTRUCTIONS ON INSTALLATION USE AND MAINTENANCE D ATHER...

Страница 2: ...n C Pressione di prova Serpentino bar Data di prova idrostatica Max Design Coil Pressure Max Allowable Temperature Min Allowable Temperature Hydraulic Test Pressure Coil Hydraulic Test Date Superficie...

Страница 3: ...3 3 Supply conditions 12 3 4 Handling 12 3 5 Positioning in boiler room 13 3 6 Hydraulic system features and connections 14 3 7 Fuel supply 15 3 8 Connection to the flue 15 3 9 Burner assembly 16 3 1...

Страница 4: ...ertaking any maintenance carefully read the instructions and proce dures contained in this manual they provide important information regarding the safety of the system and the safety of persons ATTENT...

Страница 5: ...as can cause fatal intoxica tion Switch off the system Ventilate the place of installation Interventions on the system Close the fuel shut off valve and make sure that it cannot be opened accidentally...

Страница 6: ...0 C with a thermal gradient of 40 C between oil inlet and outlet NOTE The D ATHER boilers are CE marked accord ing to Directive 2014 68 UE category I Weld ing procedures and devices are approved and c...

Страница 7: ...ate carefully follow its manufacturer s instructions provided with the generator documentation Following the intervention restore the pressure switch at a pres sure of 0 3 bar higher than the calibrat...

Страница 8: ...nection pipe to the expansion vessel must be free of shut offs must be such to prevent convective motions of the oil must not be insulated DIATHERMIC OIL COLLECTION TANK It is a simple container with...

Страница 9: ...0 260 700 1260 2480 1520 800 1270 1060 780 728 416 65 20 300 280 930 1370 3170 1620 900 1500 1160 840 808 436 80 20 350 280 1160 1540 3350 1790 1000 1780 1320 920 940 450 100 25 350 280 1500 1670 3630...

Страница 10: ...0 14 8 19 2 21 2 22 4 31 8 44 2 54 6 59 0 72 8 102 2 104 4 156 4 189 6 Coil Volume Volume Serpentino l 40 84 130 232 245 201 285 518 639 692 853 1592 1629 2464 2970 Max Coil Design Pressure Pressione...

Страница 11: ...ding to good practice rules 3 2 INSTALLATION STANDARDS It must be installed by a professionally qualified technician who shall assume the responsibility of respecting all local and or national laws pu...

Страница 12: ...mage during transport or handling For their assembly refer to the instructions supplied with the documentation provided with the generator itself 3 4 HANDLING The D ATHER generators are equipped with...

Страница 13: ...the front of the generator verify that with the door open at 90 the distance between the door and the adja cent wall is at least equal to the length of the burner b On the two sides of the generator 0...

Страница 14: ...this means that from the room temperature 20 C to a work temperature of 270 C ten metres of pipes stretch by 30 mm If not compensated the expansions cause tremendous efforts on the system components T...

Страница 15: ...ns normally the need for them to work in conditions of depression and this requires an adequate sizing The need for depression on the chimney is justified by safety reasons to avoid smoke filtrations...

Страница 16: ...rnace otherwise com bustion anomalies may occur with the risk of seriously damaging the generator If the burner is provided with air intake connect it with a rubber hose to the intake on the flame ind...

Страница 17: ...3 11 ELECTRICAL CONNECTIONS General warnings Have the electrical system checked by per sonnel professionally qualified according to law attesting the adequacy of the electrical system to the power loa...

Страница 18: ...PLAN RESET RESET ALLARME LIVELLO MIN OLIO ALARM MIN LEVEL OIL RESET RESET ALLARME CIRCOLAZIONE OLIO ALARM OIL CIRCULATION RESET ALLARME TEMPERATURA OLIO ALARM TEMPERATURE OIL RESET TACITAZIONE SIRENA...

Страница 19: ...K 10 BUZZER 11 EMERGENCY 13 CIRCULATION PUMP 1 ON 14 CIRCULATION PUMP 1 START OFF STOP START The pump starts running and gives consent to the burner OFF The pump stops running when the oil s temperatu...

Страница 20: ...n line compliant with the applicable standards in force Are the ventilation conditions and minimum distances to perform any maintenance guaranteed Are the refractory coverings intact is the furnace fr...

Страница 21: ...es the remaining air pockets and removes the coarse dirt inside the circuit which stop in the filter Do this until the air is completely bled After switching off disassemble the filters and clean the...

Страница 22: ...rculation pump must remain in motion until the oil temperature drops below 150 C ATTENTION After calibrating the burner check that the flame does not touch the bottom of the coil otherwise the cement...

Страница 23: ...RATURE TEMPERATURA RITORNO OLIO OIL RETURN TEMPERATURE RESET ALLARME SICUREZZE IMPIANTO ALARM SAFETY PLAN RESET RESET ALLARME LIVELLO MIN OLIO ALARM MIN LEVEL OIL RESET RESET ALLARME CIRCOLAZIONE OLIO...

Страница 24: ...fter a period of inactivity it is necessary to repeat the previously described start up procedures Immediately remove any unburned gas leaks by replacing the worn seal gaskets It is forbidden because...

Страница 25: ...ness of the fuel supply system this check is very important especially when using gaseous fuels After having performed maintenance and cleaning operations repeat the preliminary checks to switch on ch...

Страница 26: ...clogging of the chimney and cleanliness of the burner air path dust check sealing of the fuel supply system if gas check sealing of the flue gas circuit door burner plate cleaning door generator chimn...

Страница 27: ...in Oil overflowing from expansion vessel Remedy check that the electrical consumption of the motor in particular that the power absorbed by the pump is correct check the joint alignment check the init...

Страница 28: ...more it reserves the right to modify its products as deemed necessary or useful without affecting their essential features 46033 casteldario mantova Italy tel 39 0376 57001 telefax 39 0376 660556 info...

Отзывы: