17
Installation instructions
3.3 - TERMS OF SUPPLY
The
BAHR’UNO
generators are supplied in single-block.
Upon receipt, after having removed the packaging
make sure the content is intact.
Carry out a general inspection to verify the absence
of damage due to transport, checking the conditions
of the refractory of the tailgate, the presence of
turbulators and their correct position inside smoke
pipes (OR - STD versions).
3.4 - HANDLING
The BAHR’UNO boilers are equipped with lifting eyebolts.
Pay attention when handling the boiler and use equipment suit-
able for its weight.
NOTE:
Normally, the generators are supplied fully
assembled. In particular cases, to avoid dam-
age during transportation or handling, some
units are supplied unassembled.
For the reassembly, refer to the instructions
supplied together with the documentation
supplied with the generator.
Содержание BAHR'UNO
Страница 1: ...BAHR UNO INSTRUCTIONS ON INSTALLATION USE AND MAINTENANCE ...
Страница 49: ......