31
Installation instructions
3.16 - FIRST IGNITION
Preliminary checks
The installation, operation and maintenance
must be carried out in compliance with the
regulations in force, following the instruc-
tions described in this manual; also, any op-
eration must be carried out by professionally
qualified and authorised personnel.
ATTENTION!
ANY INTERVENTION ON THE APPLIANCE
MUST BE DONE BY PERSON ENABLED TO
RUN SYSTEMS, PURSUANT TO ITALIAN
LEGISLATIVE DECREE 1 MARCH 1974:
"RULES TO ENABLE TO RUN STEAM GEN-
ERATORS"
IT IS STRICTLY FORBIDDEN FOR PERSONS
NOT SPECIFICALLY ENABLED TO USE, RUN,
MAINTENANCE THE APPLIANCE.
After connecting the hydraulic and electrical systems and the fuel line to the boiler, and before starting the boiler, check that:
have the connections of the hydraulic, pneumatic, electric systems and fuel been connected in compliance with
the national and local laws in force and as indicated in the manual
?
the electrical parts of the generator are wired correctly?
the connections are fully tightened?
the mains voltage and frequency are compatible with the control panel of the boiler (400V 3F + N + T)?
is the fuel supply system dimensioned
for the flow rate required for the boiler and is provided with all safety and
control devices required by the standards in force?
the g
as used (models with gas burner) corresponds to that of calibration?
is the gas supply cock open (models with gas burner)?
has gas leakage been checked
(models with gas burner)
?
Are the combustion air intake line and the flue gas evacuation line compliant with the applicable standards in
force?
Are the ventilation conditions and minimum distances to perform any maintenance guaranteed?
the boiler drain and the drains are connected to the sewage?
is the burner assembled according to the instructions contained in the manufacturer's manual and has the
burner mouthpiece infill been performed correctly?
have the electric connections of the safety devices on the burner been performed correctly?
are the refractory coverings intact?
are the turbolators inserted correctly into the smoke pipes (OR / STD versions)?
is the generator drain valve closed?
level indicators: the drains are closed and the shut-off valves open?
is the valve on the water line open?
is the valve on the steam inlet open?
is the valve on the compressed air line open?
are the shut-off valves in a position suitable for operation?
is the pump motor shaft or the pump free to rotate on a regular basis?
has the operator been trained and has the documentation been supplied?
Please tick the operations performed
Содержание BAHR'UNO
Страница 1: ...BAHR UNO INSTRUCTIONS ON INSTALLATION USE AND MAINTENANCE ...
Страница 49: ......