Cause of Troubles and Measures to be Taken
(1) 5-section boom
When retraction of the boom (3) becomes impossible at the position just before full retraction of the booms (4), (5)
and (6), inspect the plunger which is assembled in the telescoping cylinder (3).
When the boom (3) does not change over to the boom (2), and retraction becomes impossible at the position just
before full retraction, inspect the drilled hole at the position of the plunger of the telescoping cylinder (2).
(2) Cause of Troubles and Remedy
SPOOL(1)
NUT
A
B
C
ADJUSTING BOLT
STICK
14.3
(14−10)
Содержание URW295CR
Страница 1: ...MAINTENANCE MANUAL FURUKAWA UNIC CORPORATION URW295CR ...
Страница 36: ... 9 5 9 5 Back pressure valve O ring 731191018 Back pressure valve Gauge port ...
Страница 94: ... QQO VQR KP FGVCKN ...
Страница 100: ... 9 4 412 4 6 0 0 0 5 KOKV UYKVEJ ...
Страница 124: ... 㧟㧞 ...
Страница 125: ... ...