1 5-Section Boom (Triple Cylinder) Operation
(1) When Telescoping Cylinder1 extends
(14−1)
(2) When Telescoping Cylinder1 retracts
(14−2)
(3) When Telescoping Cylinder2 extends
(14−3)
(4) When Telescoping Cylinder2 retracts
(14−4)
(5) When Telescoping Cylinder3 extends
(14−5)
(6) When Telescoping Cylinder3 retracts
(14−6)
(14−7)
2 Function and Working of Cushion Seal
(1) Flow of Pressure Oil When Retracting
(14−8)
(2) Flow of Pressure Oil When Extending
(14−9)
3 Cause of Troubles and Measures to be taken
(14−10〜11)
(15−1)
(15−2)
(16−1)
(16−2〜3)
(17−1)
2 Caution to be taken when reass embling hoist winch
(17−2)
3 Cause of Troubles and Measures to be Taken(Hoist winch)
(17−3)
(18−1)
1 Construction of slewing reduction gear
(19−1)
(19−2)
3 Slewing reduction gear disassembly procedures
(19−3〜5)
1 Turntable Mounting Procedures
(20−1)
(20−2)
(21−1)
1 Construction of slip ring and its fitting position
(22−1)
Telescoping/Derrick cylinder measures to prevent piston from being
loosened
1 Tightening torque for bolts fastening column and tightening order
1 Cons truction of Hois t Winch and brake s hoe adjusting procedure
2 Position of soft zone,tightening sequence of bolts and tightening torque
(7) Adjusting Procedures for Selector Valve with Adjusting Bolt
2 Construction to be taken when reassembling Slewing reduction gear
Содержание URW295CR
Страница 1: ...MAINTENANCE MANUAL FURUKAWA UNIC CORPORATION URW295CR ...
Страница 36: ... 9 5 9 5 Back pressure valve O ring 731191018 Back pressure valve Gauge port ...
Страница 94: ... QQO VQR KP FGVCKN ...
Страница 100: ... 9 4 412 4 6 0 0 0 5 KOKV UYKVEJ ...
Страница 124: ... 㧟㧞 ...
Страница 125: ... ...