Property of Ultrasonic Power Corporation -
© 2022
Publication Number UPC220504-001
14
4. Inspection and Maintenance
4.1. General
The maintenance described in this section should be performed at best intervals
determined by the usage of the equipment, unless otherwise indicated. Should a
problem occur when operating the unit, refer to Section 5, Troubleshooting. If a policy
requires for calibration of the unit, the generators would be the only calibrated items that
UPC recommends calibrating. They may be sent back to Ultrasonic Power Corporation
for calibration on an annual basis. Please request an RMA number before shipping the
generators back to the manufacturer.
4.2. PERFORMANCE VERIFICATION
1. Check installation requirements against specifications in Section 1.
Also:
a. Inspect overall unit for signs of damage or misaligned parts.
b. If applicable, make sure leveling feet are adjusted to fit the floor.
c. If applicable, make sure the castors are locked in place to prevent
movement of system during operation.
d. If applicable, be sure all side panels are in place on the system.
NOTE: All side panels must be installed prior to operation to allow for
proper airflow to the system. This also protects the operator from potential
shock.
2. Check input voltage at the wall receptacle. The voltage at the wall
receptacle must be the same rating for the system for the system to
operate properly. Make sure system is grounded properly or erratic
operation may occur with optional Sonic Touch II control panel.
Caution: Incorrect voltage can damage the generator. Do not proceed
unless the above voltage readings are obtained. Contact the proper
authority about necessary changes at the wall receptacle.
3. Enable the power switches for each sub-system to check their operability.
a. ULTRASONICS- Turn
ON
the generator power switch. Rotate the
power intensity control (PIC) clockwise to increase the cleaning action.
Sound from transducers should increase/ decrease and you should
visually see ripples in the liquid.