background image

A.   GENERAL

:

 

The Automatic Basket Lift System can be used on any Ultrafryer Systems Electric or Gas fryer equipped with an  

      Ultrastat 11,  21 or 25 cooking computer. When the fryer’s 120 Volt electrical plug is connected to the 120 Volt power source

, BOTH

      

 (LH & RH) Basket Lift Arms will automatically 

RAISE 

to their 

UPWARD 

position. When the fryer’s toggle switch and computer are

      turned 

ON

, the computer places the fryer in the 

MELT MODE 

and will periodically cycle the fryer’s heat mechanism ON and OFF 

      to gradually heat the shortening. As long as  the fryer is in 

MELT MODE

, the Basket Lift Arms 

CANNOT 

be 

LOWERED 

into the 

      shortening. When the fryer is taken 

OUT 

of the 

MELT MODE 

and shortening is heated to it’s 

PRE

-

SET 

(

COOKING

TEMP-

       ERATURE

, the Basket Lift Arms can be 

LOWERED 

into the shortening as shown below.

B.   COOK COMPUTER BASKET LIFT CONTROL OPERATION KEYS

 

1.   ULTRASTAT 11 COOKING COMPUTER BASKET LIFT CONTROL KEYS 

TO LOWER LH BASKET
   DEPRESS           KEY

1

TO LOWER LH BASKET
   DEPRESS            KEY

2

ULTRASTAT 11 COOKING COMPUTER

      

2.   ULTRASTAT 21 COOKING COMPUTER BASKET LIFT CONTROL KEYS 

ULTRASTAT 21 COOKING COMPUTER

TO LOWER LH BASKET
 DEPRESS ANY OF THE
    FOLLOWING KEYS

Page 5 of 26

30A081

TO LOWER RH BASKET
 DEPRESS ANY OF THE
    FOLLOWING KEYS

WARNING:   DO NOT OPERATE THE BASKET LIFT WHEN A PRODUCT BASKET IS IN THE VAT BENEATH THE  
 

         BASKET HANGER PLATE

Содержание Ultrastat 11

Страница 1: ...30A081 ELECTRIC AND GAS FRYER AUTOMATIC BASKET LIFT SYSTEM Operating Instructions 302 Spencer Lane P O Box 5369 800 525 8130 210 731 5000 Fax 210 731 5099 San Antonio Texas 78201 www ultrafryer com...

Страница 2: ...system One is manufactured by SKF Motion Tech nologies and the other is fabricated by Ultrafryer Systems The Physical difference between the two can be determined by the top cap of the Basketlift Box...

Страница 3: ...5 6 Ultrastat 11 Basket Lift Operation 6 Ultrastat 21 Basket Lift Operation 7 Ultrastat 25 Basket Lift Operation 7 8 Abbreviated Operation Steps 8 MAINTENANCE General 10 Ultrafryer Fryer Maintenance...

Страница 4: ...GENERAL INFORMATION Page 1 of 26 30A081...

Страница 5: ...xes and 5 Lifter Rods is PROHIBITED Adjustment to the BASKET LIFT HEIGHT may be accomplished according to procedure contained in this manual but any other repair attempted WITHOUT the expressed approv...

Страница 6: ...RIPTION SPECIFICATIONS 1 DESCRIPTION The Model S5420212 Automatic Basket Lift system consists of an Electrical Control Box which contains the following SKF Components 1 One 1 120 24 Volt Step Down Tra...

Страница 7: ...OPERATING INSTRUCTIONS Page 4 of 26 30A081...

Страница 8: ...the Basket Lift Arms CANNOT be LOWERED into the shortening When the fryer is taken OUT of the MELT MODE and shortening is heated to it s PRE SET COOKING TEMP ERATURE the Basket Lift Arms can be LOWER...

Страница 9: ...will place the fryer in the MELT MODE While in the MELT MODE the computer will cycle the fryer s heat mechanism ON and OFF to gradually and safely raise the short ening temperature 3 When the MELT MOD...

Страница 10: ...D for that key will light BRIGHTLY and the cook time ie 3 00 will appear in the display and IMMEDIATELY start counting down 6 When the computer timer counts down to 00 00 an alarm will sound the Baske...

Страница 11: ...ES NOTE TWO 2 PRODUCTS WITH DIFFERENT COOK TIMES CAN BE COOKED IN THE SAME VAT AS LONG AS THEY HAVE IDENTICAL SET POINT COOKING TEMPERATURES NOTE DO NOT ATTEMPT TO USE A BASKETLIFT SYSTEM WITH AN ULTR...

Страница 12: ...MAINTENANCE Page 9 of 26 30A081...

Страница 13: ...ollowing page for illustration and parts identification 1 Raise the shortening to it s pre set cook temperature 2 Depress the applicable computer key to LOWER the basket 3 Check to see if the product...

Страница 14: ...FIGURE 1 FIGURE 3 Page 11 of 26 30A081 6 6 FIGURE 2...

Страница 15: ...TECHNICAL ASSISTANCE ORDERING INFORMATION Page 12 of 26 30A081...

Страница 16: ...r damage to shipping containers prior to departure of the delivering carrier Any damage must be notated on the receiving docu ment to facilitate filing of freight claims Carriers must be notified imme...

Страница 17: ...PARTS IDENTIFICATION Page 14 of 26 30A081...

Страница 18: ...Locate the part on the following sketches and note the index number i e 3 6 etc then obtain the part number and description for that index number on the page facing the sketches Use that part number w...

Страница 19: ...t on the following sketches and note the index number i e 3 6 etc then obtain the part number and description for that index number on the page facing the sketches Use that part number when ordering a...

Страница 20: ...d Vat Fryer 19B556 SET 5 Basket Lift Arm Set Consisting Of Left Hand And Right Hand Lift Arms F 18 508mm Vat Fryer Triple Basket Capability 19B561 1 6 Basket Lift Cabinet Support Structure 14 356mm Fr...

Страница 21: ...WIRING DIAGRAMS Page 18 of 26 30A081...

Страница 22: ...WIRING DIAGRAM Page 19 of 26 30A081 Applicable Only To Electric Fryers With U25 Controllers WITH Basket Lifts...

Страница 23: ...WIRING DIAGRAM Page 20 of 26 30A081 Applicable Only Electric Fryers With U21 Controllers WITH Basket Lifts...

Страница 24: ...WIRING DIAGRAM Page 21 of 26 30A081 Applicable Only To Electric Fryers With U22 Controllers WITH Basket Lifts...

Страница 25: ...WIRING DIAGRAM Page 22 of 26 30A081 Applicable Only To Gas PAR 2 Bank or PAR 2 3 Stand Alone Fryers With U25 Controllers WITH Basket Lifts...

Страница 26: ...WIRING DIAGRAM Page 23 of 26 30A081 Applicable Only To Gas PAR 3 Bank Fryers With U25 Controllers WITH Basket Lifts...

Страница 27: ...WIRING DIAGRAM Page 24 of 26 30A081 Applicable Only To Gas PAR 2 3 Fryers With U21 Controllers WITH Basket Lifts...

Страница 28: ...WIRING DIAGRAM Page 25 of 26 30A081 Applicable Only To Gas PAR 2 3 Fryers With U22 Controllers WITH Basket Lifts...

Страница 29: ...THIS PAGE INTENTIONALLY BLANK Page 26 of 26 30A081...

Отзывы: