ULTRAFRYER Systems Ultrastat 11 Скачать руководство пользователя страница 6

B.   SAFETY:  The Model S5420212 Automatic Basket Lift System operates on 120 Volts, 60HZ, single phase electrical power, and like
      other electrical equipment, should not be operated with wet hands or while standing in water. Water should 

NEVER

 be sprayed on

      or at the rear of the Basket Lift System as there is danger of electrical shock and/or serious damage to the system electrical circuitry. 
      The Basket Lift System is located in close proximity to 

HOT

 shortening and care must be taken to avoid serious burns from acci-

      dental shortening splatters. The floors in front and behind the fryer should be kept clean and dry.

C.

   

SAFE CLEANING PROCEDURES: Before performing any cleaning routine, electrical power to the Basket Lift system 

MUST

 be

      removed by disconnecting the fryer’s 120 Volt electrical plug from the 120 Volt electrical receptacle. A dampened cloth with sanitizer 
      solution may then be used to clean debris from the Basket Lift Arms, Rollers, Roller Guides and Basket Lift System.

D.   MANUFACTURED BASKET LIFT COMPONNETS - Although the basket lift assembly is provided by SKF Motion Technologies, 
       Ultrafryer Systems, Inc. provides the necessary sub components to complete the system. These parts include:
 

1. Basket Lift Arms

 

2. Roller Guide Basket Bracket

 

3. 90˚ Angle Mounting Brackets

 

4. Modified Fryer Back Panel

       These are identified in the Parts section of this manual. 

E.   DESCRIPTION / SPECIFICATIONS:

       1.   

DESCRIPTION:

 

The Model S5420212 Automatic Basket Lift system consists of an Electrical Control Box which contains the 

            following SKF Components: 
 

 

 

1) One (1) 120-24 Volt Step-Down Transformer

 

 

 

2) Two (2) Printed Circuit Boards (PCB)

 

 

 

3) Two (2) 24 Volt DC Motors

 

 

 

4) Two (2) Gear Boxes

 

 

 

5) Two (2) Lifter Rods

            In adition, there are Two (2) Electrical Cords, One (1) with a Three (3) pin male connector and One (1) with a Four(4) pin male
            connector. The three (3) pin male connector connects to a three (3) pin female socket on the fryer which provides electrical 
            power to the Basket Lift system. The Four (4) pin male connector connects to a Four (4) pin female socket attached to the fryer 
            which interfaces with the fryer’s computer to control operation of the Basket Lift system. This Basket Lift system is applicable for
            ALL three (3) currently produced vessel sizes; 14" (356mm), 18" (457mm) and 20" (508mm) Gas or Electric Ultrafryer Systems, 
            Inc. fryers. 

 

������ ����

��������� �����������

������� ������ �����

�� �����

���� ���

Three (3) Pin

Male Power

Connector

Four (4) Pin

Male Computer

Interface Connector

     Basket Lift System

Shown With Rear Panel

Removed

Page 3 of 26

30A081

  2.

   

SPECIFICATIONS:

 

The Model S5420212 Automatic Basket Lift system, Manufactured by SKF  

        Motion Technologies,  is 3 1/2" (89mm) deep, 14" (356mm) Wide and 23" (584mm) high and 
        operates on standard 120 Volt single phase 60 Hz electrical power.

        NOTE:   THE ULTRASTAT COOKING COMPUTER IS PROGRAMMED SO THAT THE 
 

        BASKET LIFT SYSTEM CAN ONLY BE OPERATED WHEN SHORTENING IS 

 

        AT ITS PRE-SET COOKING TEMPERATURE.

WARNING:   DO NOT OPERATE THE BASKET LIFT WHEN A PRODUCT BASKET IS IN THE VAT BENEATH THE  
 

         BASKET HANGER PLATE

Содержание Ultrastat 11

Страница 1: ...30A081 ELECTRIC AND GAS FRYER AUTOMATIC BASKET LIFT SYSTEM Operating Instructions 302 Spencer Lane P O Box 5369 800 525 8130 210 731 5000 Fax 210 731 5099 San Antonio Texas 78201 www ultrafryer com...

Страница 2: ...system One is manufactured by SKF Motion Tech nologies and the other is fabricated by Ultrafryer Systems The Physical difference between the two can be determined by the top cap of the Basketlift Box...

Страница 3: ...5 6 Ultrastat 11 Basket Lift Operation 6 Ultrastat 21 Basket Lift Operation 7 Ultrastat 25 Basket Lift Operation 7 8 Abbreviated Operation Steps 8 MAINTENANCE General 10 Ultrafryer Fryer Maintenance...

Страница 4: ...GENERAL INFORMATION Page 1 of 26 30A081...

Страница 5: ...xes and 5 Lifter Rods is PROHIBITED Adjustment to the BASKET LIFT HEIGHT may be accomplished according to procedure contained in this manual but any other repair attempted WITHOUT the expressed approv...

Страница 6: ...RIPTION SPECIFICATIONS 1 DESCRIPTION The Model S5420212 Automatic Basket Lift system consists of an Electrical Control Box which contains the following SKF Components 1 One 1 120 24 Volt Step Down Tra...

Страница 7: ...OPERATING INSTRUCTIONS Page 4 of 26 30A081...

Страница 8: ...the Basket Lift Arms CANNOT be LOWERED into the shortening When the fryer is taken OUT of the MELT MODE and shortening is heated to it s PRE SET COOKING TEMP ERATURE the Basket Lift Arms can be LOWER...

Страница 9: ...will place the fryer in the MELT MODE While in the MELT MODE the computer will cycle the fryer s heat mechanism ON and OFF to gradually and safely raise the short ening temperature 3 When the MELT MOD...

Страница 10: ...D for that key will light BRIGHTLY and the cook time ie 3 00 will appear in the display and IMMEDIATELY start counting down 6 When the computer timer counts down to 00 00 an alarm will sound the Baske...

Страница 11: ...ES NOTE TWO 2 PRODUCTS WITH DIFFERENT COOK TIMES CAN BE COOKED IN THE SAME VAT AS LONG AS THEY HAVE IDENTICAL SET POINT COOKING TEMPERATURES NOTE DO NOT ATTEMPT TO USE A BASKETLIFT SYSTEM WITH AN ULTR...

Страница 12: ...MAINTENANCE Page 9 of 26 30A081...

Страница 13: ...ollowing page for illustration and parts identification 1 Raise the shortening to it s pre set cook temperature 2 Depress the applicable computer key to LOWER the basket 3 Check to see if the product...

Страница 14: ...FIGURE 1 FIGURE 3 Page 11 of 26 30A081 6 6 FIGURE 2...

Страница 15: ...TECHNICAL ASSISTANCE ORDERING INFORMATION Page 12 of 26 30A081...

Страница 16: ...r damage to shipping containers prior to departure of the delivering carrier Any damage must be notated on the receiving docu ment to facilitate filing of freight claims Carriers must be notified imme...

Страница 17: ...PARTS IDENTIFICATION Page 14 of 26 30A081...

Страница 18: ...Locate the part on the following sketches and note the index number i e 3 6 etc then obtain the part number and description for that index number on the page facing the sketches Use that part number w...

Страница 19: ...t on the following sketches and note the index number i e 3 6 etc then obtain the part number and description for that index number on the page facing the sketches Use that part number when ordering a...

Страница 20: ...d Vat Fryer 19B556 SET 5 Basket Lift Arm Set Consisting Of Left Hand And Right Hand Lift Arms F 18 508mm Vat Fryer Triple Basket Capability 19B561 1 6 Basket Lift Cabinet Support Structure 14 356mm Fr...

Страница 21: ...WIRING DIAGRAMS Page 18 of 26 30A081...

Страница 22: ...WIRING DIAGRAM Page 19 of 26 30A081 Applicable Only To Electric Fryers With U25 Controllers WITH Basket Lifts...

Страница 23: ...WIRING DIAGRAM Page 20 of 26 30A081 Applicable Only Electric Fryers With U21 Controllers WITH Basket Lifts...

Страница 24: ...WIRING DIAGRAM Page 21 of 26 30A081 Applicable Only To Electric Fryers With U22 Controllers WITH Basket Lifts...

Страница 25: ...WIRING DIAGRAM Page 22 of 26 30A081 Applicable Only To Gas PAR 2 Bank or PAR 2 3 Stand Alone Fryers With U25 Controllers WITH Basket Lifts...

Страница 26: ...WIRING DIAGRAM Page 23 of 26 30A081 Applicable Only To Gas PAR 3 Bank Fryers With U25 Controllers WITH Basket Lifts...

Страница 27: ...WIRING DIAGRAM Page 24 of 26 30A081 Applicable Only To Gas PAR 2 3 Fryers With U21 Controllers WITH Basket Lifts...

Страница 28: ...WIRING DIAGRAM Page 25 of 26 30A081 Applicable Only To Gas PAR 2 3 Fryers With U22 Controllers WITH Basket Lifts...

Страница 29: ...THIS PAGE INTENTIONALLY BLANK Page 26 of 26 30A081...

Отзывы: